Coaches
Prototype Intercity 2 (IC 2) is the new name for the DB Fernverkehr AG TWINDEXX Vario® trains introduced following the timetable change on 13.12.2015. The TWINDEXX-Vario® is a further development of the tried-and-trusted double-deck platform from Görlitz. Each train has 468 seats, 70 of which are in 1st class, as well as 10 bicycle parking spaces. The trains have a maximum permissible speed of 160 km/h. It was right back in 2010 that Bombardier Transportation received its first order for 27 five-part double-deck trains in combination with BR 146.5 locomotives. These were ordered under a framework contract for a total of 800 double-deck coaches that had already been concluded with DB AG in advance. Since then, 69 train units comprising a total of 328 individual coaches have been called off under this framework contract. As part of DB Fernverkehr AG’s long-distance traffic concept, the IC 2 will gradually increase long-distance capacity and replace the existing IC trains. As of the beginning of 2019, IC 2 trains are already operating on the following routes: Leipzig – Norddeich Mole Dresden – Cologne Koblenz – Norddeich Mole Stuttgart – Singen Karlsruhe – Nuremberg Further routes are currently being planned. Model Exactly scale 1:87 True-to-original length over buffer Structure made of high-quality, impact-resistant plastic Metal bottom plate Printed window frames In-plane assembled windows Illuminated destination indicator (digital) Lighting with warm white LEDs Illuminated driver's cab True-to-scale details Extra mounted windscreen wiper Perfectly replicated three-dimensional front Multipart bogies Fine paintwork and painting Painting adjusted for BRAWA TRAXX Electric Locomotive BR 146.5 With interior fittings, incl. driver's cab NEM-standard close coupling Light change white/red, in the direction of travel Metal bearing ZugBus: automatic detection of the first and last model in the train; controlling and programming of all functions; detection of brake sections ZugBUS-Functions are only available in digital mode
On order, shipped within 10-15 days
Prototype Intercity 2 (IC 2) is the new name for the DB Fernverkehr AG TWINDEXX Vario® trains introduced following the timetable change on 13.12.2015. The TWINDEXX-Vario® is a further development of the tried-and-trusted double-deck platform from Görlitz. Each train has 468 seats, 70 of which are in 1st class, as well as 10 bicycle parking spaces. The trains have a maximum permissible speed of 160 km/h. It was right back in 2010 that Bombardier Transportation received its first order for 27 five-part double-deck trains in combination with BR 146.5 locomotives. These were ordered under a framework contract for a total of 800 double-deck coaches that had already been concluded with DB AG in advance. Since then, 69 train units comprising a total of 328 individual coaches have been called off under this framework contract. As part of DB Fernverkehr AG’s long-distance traffic concept, the IC 2 will gradually increase long-distance capacity and replace the existing IC trains. As of the beginning of 2019, IC 2 trains are already operating on the following routes: Leipzig – Norddeich Mole Dresden – Cologne Koblenz – Norddeich Mole Stuttgart – Singen Karlsruhe – Nuremberg Further routes are currently being planned. Model Exactly scale 1:87 True-to-original length over buffer Structure made of high-quality, impact-resistant plastic Metal bottom plate Printed window frames In-plane assembled windows Illuminated destination indicator (digital) Lighting with warm white LEDs Illuminated driver's cab True-to-scale details Extra mounted windscreen wiper Perfectly replicated three-dimensional front Multipart bogies Fine paintwork and painting Painting adjusted for BRAWA TRAXX Electric Locomotive BR 146.5 With interior fittings, incl. driver's cab NEM-standard close coupling Light change white/red, in the direction of travel Metal bearing ZugBus: automatic detection of the first and last model in the train; controlling and programming of all functions; detection of brake sections ZugBUS-Functions are only available in digital mode
On order, shipped within 10-15 days
Free standing handle bars Perforated fan Individually mounted heating systems Individually mounted brake systems With interior fittings Bogie with three-point support NEM-standard short-coupling True to original axle box cover Individually mounted metal springs Finely engraved rivets
On order, shipped within 10-15 days
Free standing handle bars Perforated fan Individually mounted heating systems Individually mounted brake systems With interior fittings Bogie with three-point support NEM-standard short-coupling True to original axle box cover Individually mounted metal springs Finely engraved rivets
On order, shipped within 10-15 days
Free standing handle bars Perforated fan Individually mounted heating systems Individually mounted brake systems With interior fittings Bogie with three-point support NEM-standard short-coupling True to original axle box cover Individually mounted metal springs Finely engraved rivets
On order, shipped within 10-15 days
Length over the buffers: 234.7 mm Interior details: fitted Interior lighting: prepared for BRAWA item no. 2212 Close coupling mechanism: fitted AC wheelset exchange: possible AC wheelset: BRAWA item no. 2181 AC pickup shoe: BRAWA item no. 2221
On order, lead time to be confirmed
Length over the buffers: 234.7 mm Interior details: fitted Interior lighting: prepared for BRAWA item no. 2212 Close coupling mechanism: fitted AC wheelset exchange: possible AC wheelset: BRAWA order no. 2181 AC pickup shoe: BRAWA item no. 2221
On order, lead time to be confirmed
Length over the buffers: 234.7 mm Interior details: fitted Interior lighting: prepared for BRAWA item no. 2212 Close coupling mechanism: fitted AC wheelset exchange: possible AC wheelset: BRAWA item no. 2181 AC pickup shoe: BRAWA item no. 2221
On order, lead time to be confirmed
Length over the buffers: 234.7 mm Interior details: fitted Interior lighting: prepared for BRAWA item no. 2212 Close coupling mechanism: fitted AC wheelset exchange: possible AC wheelset: BRAWA item no. 2181 AC pickup shoe: BRAWA item no. 2221
On order, lead time to be confirmed
Length over the buffers: 234.7 mm Interior details: fitted Interior lighting: prepared for BRAWA item no. 2212 Close coupling mechanism: fitted AC wheelset exchange: possible AC wheelset: BRAWA order no. 2181 AC pickup shoe: BRAWA item no. 2221
On order, lead time to be confirmed
Length over the buffers: 234.7 mm Interior details: fitted Interior lighting: prepared for BRAWA item no. 2212 Close coupling mechanism: fitted AC wheelset exchange: possible AC wheelset: BRAWA order no. 2181 AC pickup shoe: BRAWA item no. 2221
On order, lead time to be confirmed
Prototype Prussian-type express train coaches represented the majority of the Deutsche Reichsbahn car fleet, solely because of the number of cars used. Even though the DRG had more unit cars than Prussian express train coaches because of its car construction programmes in the early thirties, there still wasn’t a single express train which was not accompanied by a former Prussian car. Model True to original bogies True to scale side frames Tip bearing wheelsets True to original bellows Multi-part brake systems Brake blocks in wheel plane
On order, shipped within 10-15 days
Prototype Prussian-type express train coaches represented the majority of the Deutsche Reichsbahn car fleet, solely because of the number of cars used. Even though the DRG had more unit cars than Prussian express train coaches because of its car construction programmes in the early thirties, there still wasn’t a single express train which was not accompanied by a former Prussian car. Model True to original bogies True to scale side frames Tip bearing wheelsets True to original bellows Multi-part brake systems Brake blocks in wheel plane
On order, shipped within 10-15 days
Prototype Despite heavy losses, DB still retained a considerable inventory of standard secondary line coaches as well as trailer cars that were derived from them. As was the case before the war, the majority of these vehicles were used between Freiburg, Neustadt and Seebrugg. Otherwise, passenger coaches were usually operated as individual units in the other directorates. In addition to travelling behind combustion-driven railcars, the trailer cars were also often operated in tandem with electric railcars; in order to do so, DB converted the majority into control cars. However, some vehicles remained that could only be used as trailer cars as well as some control cars for combustion-driven railcars. The Nuremberg federal railway directorate continued to remain a paradise for these trailer cars and control cars in the 1950s. On numerous main and secondary railways, the combustion-driven railcar vehicles in the pre-war design complete with combustion-driven railcar trailer cars and combustion-driven railcar control cars ensured inexpensive operation before they were replaced by the saviour of secondary railways – the railbus. Model Wheel sets in toe bearing Brake shoes in wheel plane Individually mounted axle box cover Extra mounted steps True-to-epoch different spring buffers Extra mounted brake system and Wendler-Ventilators Separately mounted axle brake rod Fine paintwork and painting Fine engravings and rivets Separately mounted lines, handrails and signal holder Originally reproduced, three-dimensional frame body True-to-original interior fittings
On order, shipped within 10-15 days
Prototype Despite heavy losses, DB still retained a considerable inventory of standard secondary line coaches as well as trailer cars that were derived from them. As was the case before the war, the majority of these vehicles were used between Freiburg, Neustadt and Seebrugg. Otherwise, passenger coaches were usually operated as individual units in the other directorates. In addition to travelling behind combustion-driven railcars, the trailer cars were also often operated in tandem with electric railcars; in order to do so, DB converted the majority into control cars. However, some vehicles remained that could only be used as trailer cars as well as some control cars for combustion-driven railcars. The Nuremberg federal railway directorate continued to remain a paradise for these trailer cars and control cars in the 1950s. On numerous main and secondary railways, the combustion-driven railcar vehicles in the pre-war design complete with combustion-driven railcar trailer cars and combustion-driven railcar control cars ensured inexpensive operation before they were replaced by the saviour of secondary railways – the railbus. Model Wheel sets in toe bearing Brake shoes in wheel plane Individually mounted axle box cover Extra mounted steps True-to-epoch different spring buffers Extra mounted brake system and Wendler-Ventilators Separately mounted axle brake rod Fine paintwork and painting Fine engravings and rivets Separately mounted lines, handrails and signal holder Originally reproduced, three-dimensional frame body True-to-original interior fittings
On order, shipped within 10-15 days
Prototype Despite heavy losses, DB still retained a considerable inventory of standard secondary line coaches as well as trailer cars that were derived from them. As was the case before the war, the majority of these vehicles were used between Freiburg, Neustadt and Seebrugg. Otherwise, passenger coaches were usually operated as individual units in the other directorates. In addition to travelling behind combustion-driven railcars, the trailer cars were also often operated in tandem with electric railcars; in order to do so, DB converted the majority into control cars. However, some vehicles remained that could only be used as trailer cars as well as some control cars for combustion-driven railcars. The Nuremberg federal railway directorate continued to remain a paradise for these trailer cars and control cars in the 1950s. On numerous main and secondary railways, the combustion-driven railcar vehicles in the pre-war design complete with combustion-driven railcar trailer cars and combustion-driven railcar control cars ensured inexpensive operation before they were replaced by the saviour of secondary railways – the railbus. Model Wheel sets in toe bearing Brake shoes in wheel plane Individually mounted axle box cover Extra mounted steps True-to-epoch different spring buffers Extra mounted brake system and Wendler-Ventilators Separately mounted axle brake rod Fine paintwork and painting Fine engravings and rivets Separately mounted lines, handrails and signal holder Originally reproduced, three-dimensional frame body True-to-original interior fittings
On order, shipped within 10-15 days
Prototype Despite heavy losses, DB still retained a considerable inventory of standard secondary line coaches as well as trailer cars that were derived from them. As was the case before the war, the majority of these vehicles were used between Freiburg, Neustadt and Seebrugg. Otherwise, passenger coaches were usually operated as individual units in the other directorates. In addition to travelling behind combustion-driven railcars, the trailer cars were also often operated in tandem with electric railcars; in order to do so, DB converted the majority into control cars. However, some vehicles remained that could only be used as trailer cars as well as some control cars for combustion-driven railcars. The Nuremberg federal railway directorate continued to remain a paradise for these trailer cars and control cars in the 1950s. On numerous main and secondary railways, the combustion-driven railcar vehicles in the pre-war design complete with combustion-driven railcar trailer cars and combustion-driven railcar control cars ensured inexpensive operation before they were replaced by the saviour of secondary railways – the railbus. Model Wheel sets in toe bearing Brake shoes in wheel plane Individually mounted axle box cover Extra mounted steps True-to-epoch different spring buffers Extra mounted brake system and Wendler-Ventilators Separately mounted axle brake rod Fine paintwork and painting Fine engravings and rivets Separately mounted lines, handrails and signal holder Originally reproduced, three-dimensional frame body True-to-original interior fittings
On order, shipped within 10-15 days
Prototype Despite heavy losses, DB still retained a considerable inventory of standard secondary line coaches as well as trailer cars that were derived from them. As was the case before the war, the majority of these vehicles were used between Freiburg, Neustadt and Seebrugg. Otherwise, passenger coaches were usually operated as individual units in the other directorates. In addition to travelling behind combustion-driven railcars, the trailer cars were also often operated in tandem with electric railcars; in order to do so, DB converted the majority into control cars. However, some vehicles remained that could only be used as trailer cars as well as some control cars for combustion-driven railcars. The Nuremberg federal railway directorate continued to remain a paradise for these trailer cars and control cars in the 1950s. On numerous main and secondary railways, the combustion-driven railcar vehicles in the pre-war design complete with combustion-driven railcar trailer cars and combustion-driven railcar control cars ensured inexpensive operation before they were replaced by the saviour of secondary railways – the railbus. Model Wheel sets in toe bearing Brake shoes in wheel plane Individually mounted axle box cover Extra mounted steps True-to-epoch different spring buffers Extra mounted brake system and Wendler-Ventilators Separately mounted axle brake rod Fine paintwork and painting Fine engravings and rivets Separately mounted lines, handrails and signal holder Originally reproduced, three-dimensional frame body True-to-original interior fittings
On order, shipped within 10-15 days
Prototype Despite heavy losses, DB still retained a considerable inventory of standard secondary line coaches as well as trailer cars that were derived from them. As was the case before the war, the majority of these vehicles were used between Freiburg, Neustadt and Seebrugg. Otherwise, passenger coaches were usually operated as individual units in the other directorates. In addition to travelling behind combustion-driven railcars, the trailer cars were also often operated in tandem with electric railcars; in order to do so, DB converted the majority into control cars. However, some vehicles remained that could only be used as trailer cars as well as some control cars for combustion-driven railcars. The Nuremberg federal railway directorate continued to remain a paradise for these trailer cars and control cars in the 1950s. On numerous main and secondary railways, the combustion-driven railcar vehicles in the pre-war design complete with combustion-driven railcar trailer cars and combustion-driven railcar control cars ensured inexpensive operation before they were replaced by the saviour of secondary railways – the railbus. Model Wheel sets in toe bearing Brake shoes in wheel plane Individually mounted axle box cover Extra mounted steps True-to-epoch different spring buffers Extra mounted brake system and Wendler-Ventilators Separately mounted axle brake rod Fine paintwork and painting Fine engravings and rivets Separately mounted lines, handrails and signal holder Originally reproduced, three-dimensional frame body True-to-original interior fittings
On order, shipped within 10-15 days
Prototype In 1883, the Württembergische Staatsbahn received a delivery of 10 passenger coaches from the Maschinenfabrik Esslingen 10, which had a strong Prussian appearance with their skylight roof. Originally they had 6 seats in 1st class and 28 seats in 2nd class as well as a toilet. With the ever expanding rail network in Germany, it became necessary to offer night trains as well in the future. For this purpose, sleeperettes were fitted out, which could clearly be distinguished from passenger coaches from a distance due to their livery. Model Extra mounted steps and handrails in low-material thickness Very finely pierced roof pillar Multi part brake system with brake shoes in wheel plane
On order, shipped within 10-15 days
Prototype In 1883, the Württembergische Staatsbahn received a delivery of 10 passenger coaches from the Maschinenfabrik Esslingen 10, which had a strong Prussian appearance with their skylight roof. Originally they had 6 seats in 1st class and 28 seats in 2nd class as well as a toilet. With the ever expanding rail network in Germany, it became necessary to offer night trains as well in the future. For this purpose, sleeperettes were fitted out, which could clearly be distinguished from passenger coaches from a distance due to their livery. Model Extra mounted steps and handrails in low-material thickness Very finely pierced roof pillar Multi part brake system with brake shoes in wheel plane
On order, shipped within 10-15 days
Prototype In 1883, the Württembergische Staatsbahn received a delivery of 10 passenger coaches from the Maschinenfabrik Esslingen 10, which had a strong Prussian appearance with their skylight roof. Originally they had 6 seats in 1st class and 28 seats in 2nd class as well as a toilet. With the ever expanding rail network in Germany, it became necessary to offer night trains as well in the future. For this purpose, sleeperettes were fitted out, which could clearly be distinguished from passenger coaches from a distance due to their livery. Model Extra mounted steps and handrails in low-material thickness Very finely pierced roof pillar Multi part brake system with brake shoes in wheel plane
On order, shipped within 10-15 days
Prototype Although the SBB had taken over large numbers of the American four-axle coaches and the coaches had proven their worth in service, when ordering new vehicles it was decided to use a three-axle design. After some time, the long coach body showed a high level of warping and deformation. The reason for this was the very poor running properties of the primitive bogies without secondary suspension. Nevertheless, some remained in service until 1941 and trains formed solely with four-axle coaches of the same class still travelled between Winterthur and Wil in 1930. Model Tip bearing wheelsets Extra wheel bearing and suspension system True-to-scale side frames Extra gas tank Completely lacquered wagon body, housing and roof with soot marks Handles and steps in lower-density material
On order, shipped within 10-15 days
Prototype Although the SBB had taken over large numbers of the American four-axle coaches and the coaches had proven their worth in service, when ordering new vehicles it was decided to use a three-axle design. After some time, the long coach body showed a high level of warping and deformation. The reason for this was the very poor running properties of the primitive bogies without secondary suspension. Nevertheless, some remained in service until 1941 and trains formed solely with four-axle coaches of the same class still travelled between Winterthur and Wil in 1930. Model Tip bearing wheelsets Extra wheel bearing and suspension system True-to-scale side frames Extra gas tank Completely lacquered wagon body, housing and roof with soot marks Handles and steps in lower-density material
On order, shipped within 10-15 days