Buildings
This small signal tower has an outer staircase and 3 control desks on the first floor. Its architectural style matches the signal towers on level crossings (art. 222170 and art. 222171).
On order, shipped within 4-5 days
A structure spanning two tracks. Catenary operation possible. Clearance: 43 mm (without track).
On order, shipped within 4-5 days
Gantry signal box spanning three tracks. It will enhance any station approach.
On order, shipped within 4-5 days
Half-timbered signal tower with outside staircase and interior details on the second floor.
On order, shipped within 4-5 days
Platform, covered, with passenger’s exit, access ramps and accessories.
On order, shipped within 4-5 days
The railway crossing is fitted with electric drive, which noiselessly and realistically slowly opens and closes the gates. The crossing can be installed on single and multiple track straights and bends of all track types. (12-16 V, AC voltage, 60 mA)
On order, shipped within 4-5 days
Level crossing with gatekeeper’s lodge. For incorporation into one-track or multi-track routes. Without drive.
On order, shipped within 4-5 days
Loading crane slewing by hand. Without lifting or lowering function. Various types of loads are included.
On order, shipped within 4-5 days
Tools for the maintenance of road beds are stored in them.
On order, shipped within 4-5 days
Drive-up loading ramp with loading crane. Ideal for the transfer of goods in the railway area.
On order, shipped within 4-5 days
Freight depot with roofed ramps on both sides and gates that can be built open or closed. A large, turnable crane is located on the end of the loading ramp.
On order, shipped within 4-5 days
Sawmill with large wood storage area, exhaust and loading ramp.
On order, lead time to be confirmed
Substantial building complex with administrative block, production hall and warehouse with covered loading ramp. The above-ground conveyor system with transport crates, which connects the production area with the warehouse, can be powered using the FALLER motor (item 180629, 12–16 V, AC voltage, not included).
On order, shipped within 4-5 days
With verandah, shutters and tar covered roof. Use on construction sites, in the station area or industrial sites.
On order, shipped within 4-5 days
The conveyor system consists of the shaft shed with headgear and the winch house with its own steam energy winch supply. The dumping mechanism on the side of the shaft shed enables the simulation of a railway loading process. With the FALLER motor (art. 180629, 12-16 V, AC voltage) both large cable sheaves in the headgear can be set into motion. For the realistic decoration of the surroundings the FALLER coals (art. 170723) are required.
On order, shipped within 4-5 days
Freight shed made of wood, with loading ramp and lateral ramp for vehicles.
On order, shipped within 4-5 days
Surface supply tank with petrol pump and filling hose. Now, every small company can provide its vehicles with diesel oil.
On order, shipped within 4-5 days
Timber construction stone crushing plant.
On order, shipped within 4-5 days
The large gantry crane can be fitted with a clamshell grab, hook or log grab, and is thus suitable for operation in the most varied working areas. Cabin and jib can be adjusted manually. Clearance under the gantry 43 mm. Crane can be moved manually on its own 190 mm track.
On order, shipped within 4-5 days
This very typical railway model can not only be used in the depot. A gantry crane can be built with the parts of this construction kit, which spans over two or three tracks.
On order, shipped within 4-5 days
Small portal crane for handling goods from street to railway or railway to ships. Top of crane can be rotated manually.
On order, shipped within 4-5 days
A typical factory in highly detailed brickwork. By using several kits this building can be extended in height and length.
On order, shipped within 4-5 days
"With factory chimney
On order, shipped within 4-5 days
Two production halls with North light roof – to go with the main factory building (art. 222201). Extensions to be added.
On order, lead time to be confirmed