Scenery Accessories
66 mm wide, 1 m long, with side boundary lines.
On order, lead time to be confirmed
Parking space 120 x 100 mm and 4 parking bays. Self-adhesive. Same colour and material structure as the asphalt roads. Ideal complement to the 7087 asphalt road or the 7097 road construction set.
On order, lead time to be confirmed
40 mm wide, 1 m long. With cobblestone embossing. Busch road strips are self-adhesive, flexible and only 0.6 mm thick.
On order, lead time to be confirmed
Approximately 40 mm wide, 1 m long. Suitable as a road in N scale and as a path in TT and H0 scale. Self-adhesive.
On order, lead time to be confirmed
66 mm wide, 1 m long. Busch road markings are self-adhesive and highly flexible. Only 0.6 mm thick.
On order, lead time to be confirmed
1 m of flexible, self-adhesive field path, approx. 23 mm wide.
On order, lead time to be confirmed
40 mm wide, 2 m long, with centre lines and side boundary lines.
On order, lead time to be confirmed
Size: 560 x 330 mm. With cobblestone embossing. Same colour and material structure as cobblestone road 7078.
On order, lead time to be confirmed
Size: 560 x 330 mm. With cobblestone embossing. Same colour and material structure as cobblestone road 7078.
On order, lead time to be confirmed
55 mm wide, 2 m long. Busch road strips are self-adhesive, flexible and only 0.6 mm thick.
On order, lead time to be confirmed
A 2 m road strip (80 mm wide) with asphalt texture, a placement foil (200 x 160 mm) and a 50-piece detailing accessory set (traffic signs, guardrails, scuff marks, etc.).
On order, lead time to be confirmed
Semicircle, self-adhesive. Road 80 mm wide, diameter 230 mm, with the same colour and material structure as the asphalt roads. The semicircle can be cut with scissors, e.g. into quarter-circles or sections with any angles.
On order, lead time to be confirmed
Fitted with construction workers, barriers, jerry cans and ramp plates. Ready-built model.
On order, lead time to be confirmed
Garden shredder with gardener, chippings, wheelbarrow and garden tools.
On order, lead time to be confirmed
Tree trimming scene with a municipal worker in safety clothing, using a chainsaw to carry out tree maintenance on a tall tree trunk from top to bottom. Supplied with a ladder and cut branches.
On order, lead time to be confirmed
A scene of tree removal, with a municipal worker in safety clothing and with a chainsaw and cut branches.
On order, lead time to be confirmed
Figure A forester marking trees for felling with a spray can. Includes three marked trunks with roots.
On order, lead time to be confirmed
Forest workers debarking tree trunks infested by bark beetles. Supplied with 3 already stripped tree trunks, one trunk « en cours » and suitable tools such as a bark scraper and chainsaw.
On order, lead time to be confirmed
Filigree metal fence. 5 elements, each 22 mm wide and 12 mm high. With 10 concrete feet.
On order, lead time to be confirmed
The new wire mesh fence consists of a special aluminium fine mesh, which is 0.1 mm thick and has a mesh width of only 1.2 mm. This results in a prototypical-looking fence even in N gauge models.
On order, lead time to be confirmed
Versatile wire mesh fence for industrial sites, factories, military installations, etc. Concrete posts with anti-climb protection. Large two-wing opening metal gate. Kit.
On order, lead time to be confirmed
40 mm wide, 2 m long. Busch road strips are self-adhesive, flexible and only 0.6 mm thick.
On order, lead time to be confirmed
200 x 160 mm. Same colour and material structure as Altstadt-Pflaster-Straße 8131.
On order, lead time to be confirmed
27 concrete slab elements, each with a base area of 30 x 15 mm (total length over 58 cm). 40 smaller, partly trapezoidal elements for branch lines, curves, etc., and as filler pieces for tracks at level crossings. The assembly is very simple: glue the «concrete» slabs to the layout board. If necessary, use a little dry paint to bring out the wheel tracks. Insert grass tufts and dandelions into the cracks – and you have a truly attractive old concrete-slab road.
On order, lead time to be confirmed