Locomotives
Prototype At the end of the 1920s, it became clear that Deutsche Reichsbahn Gesellschaft (DRG) would have to acquire new electric locomotives, among other things, to accelerate its goods traffic. The need to increase maximum speeds to at least 80 km/h could not be met with the most recently purchased E77 and E75 series since the standard drive technology by means of bars and additional trailing wheelsets did not allow for higher speeds. The good experiences from abroad and with the two Bavarian EG 1 with the Bo’Bo’ two-bogie locomotives convinced the DRG to deviate from single-frame construction as well. The arrival of the world economic crisis in 1929, however, put a halt to this plan by interrupting the cost- intensive electrical expansion of the lines, thus eliminating the need for electric locomotives. The locomotive industry in Germany, however, feared falling behind current developments due to this pause in procurement. They therefore began developing a cheaper design at their own costs. Thus a prototype with the designation E44 70 was created at the Siemens-Schuckert Works (SSW) under the general management of Walter Reichel. This prototype later became the E44 001. SSW was able to integrate its experience with electric arc welding from its production of components for electric generators into locomotive manufacturing, which led to significant savings in materials and manufacturing costs. The prototype’s positive test results convinced DRG to further develop the new locomotive type into a universal locomotive. The result was Germany’s first two-bogie electric locomotive produced in series, which can safely be categorised as the prototype for the subsequently developed standard electric locomotive of Deutsche Bundesbahn (DB). Due to the war the delivery of the locomotives, which were registered for 90 km/h, stretched from 1933 into the postwar period, and Henschel only handed over the last one, a E44 187G, to DB on 29 November 1954. The predominant distribution to central and southern Germany led to the fact that approximately 100 locomotives remained in West Germany and around 50 in East Germany after the war. The most conspicuous design changes at DB were the lengthening of the roof shield for accident prevention and the Indusi (inductive train control system) equipment. The last locomotives, however, remained in service until 1985. Of the original 187 locomotives, only 21 still exist today, partially as museum locomotives and as spare parts donors. Model Detailed body Fine engravings and rivets Many extra mounted parts, such as handles, ladders and multi-part cooling coil Reproduction of the driver´s cab Precise replica of the bogies Separately mounted brake cylinder, brake pull rod, sand box and cowcatcher Precise replica of the roof, versions with normal and extended roof Prototypical roof-fittings, with many individually mounted parts Free-standing roof lines Various insulators Different main switch types Finely detailed pantographs True-to-original length of the roof walkways Bogie with three-point support Fine paintwork and painting 3rd front light can be switched on or off also in analog mode Driver's cab with LED lighting and in the sound version also in the machine room NEM-standard short coupling Analog models with Next18 interface Soundversion: all light functions can be switched on and off in digital mode, also machine roof lighting; optimal motor and load control for perfect running characteristics; noiseless 16-bit sound with up to 8 independent channels thanks to latest sound technology and excellent sound characteristics; compatible with all established digital systems (DCC, Motorola, SX1 und SX2); sound decoder on the main circuit board Modell: pantograph type SBS 39; main swith type R 62; with 8 sand boxes; with dynamic brake for the first time in a model (deviating photo)
On order, shipped within 10-15 days
Prototype At the end of the 1920s, it became clear that Deutsche Reichsbahn Gesellschaft (DRG) would have to acquire new electric locomotives, among other things, to accelerate its goods traffic. The need to increase maximum speeds to at least 80 km/h could not be met with the most recently purchased E77 and E75 series since the standard drive technology by means of bars and additional trailing wheelsets did not allow for higher speeds. The good experiences from abroad and with the two Bavarian EG 1 with the Bo’Bo’ two-bogie locomotives convinced the DRG to deviate from single-frame construction as well. The arrival of the world economic crisis in 1929, however, put a halt to this plan by interrupting the cost- intensive electrical expansion of the lines, thus eliminating the need for electric locomotives. The locomotive industry in Germany, however, feared falling behind current developments due to this pause in procurement. They therefore began developing a cheaper design at their own costs. Thus a prototype with the designation E44 70 was created at the Siemens-Schuckert Works (SSW) under the general management of Walter Reichel. This prototype later became the E44 001. SSW was able to integrate its experience with electric arc welding from its production of components for electric generators into locomotive manufacturing, which led to significant savings in materials and manufacturing costs. The prototype’s positive test results convinced DRG to further develop the new locomotive type into a universal locomotive. The result was Germany’s first two-bogie electric locomotive produced in series, which can safely be categorised as the prototype for the subsequently developed standard electric locomotive of Deutsche Bundesbahn (DB). Due to the war the delivery of the locomotives, which were registered for 90 km/h, stretched from 1933 into the postwar period, and Henschel only handed over the last one, a E44 187G, to DB on 29 November 1954. The predominant distribution to central and southern Germany led to the fact that approximately 100 locomotives remained in West Germany and around 50 in East Germany after the war. The most conspicuous design changes at DB were the lengthening of the roof shield for accident prevention and the Indusi (inductive train control system) equipment. The last locomotives, however, remained in service until 1985. Of the original 187 locomotives, only 21 still exist today, partially as museum locomotives and as spare parts donors. Model Detailed body Fine engravings and rivets Many extra mounted parts, such as handles, ladders and multi-part cooling coil Reproduction of the driver´s cab Precise replica of the bogies Separately mounted brake cylinder, brake pull rod, sand box and cowcatcher Precise replica of the roof, versions with normal and extended roof Prototypical roof-fittings, with many individually mounted parts Free-standing roof lines Various insulators Different main switch types Finely detailed pantographs True-to-original length of the roof walkways Bogie with three-point support Fine paintwork and painting 3rd front light can be switched on or off also in analog mode Driver's cab with LED lighting and in the sound version also in the machine room NEM-standard short coupling Analog models with Next18 interface Soundversion: all light functions can be switched on and off in digital mode, also machine roof lighting; optimal motor and load control for perfect running characteristics; noiseless 16-bit sound with up to 8 independent channels thanks to latest sound technology and excellent sound characteristics; compatible with all established digital systems (DCC, Motorola, SX1 und SX2); sound decoder on the main circuit board Modell: pantograph type SBS 39; main swith type R 62; with 8 sand boxes; with dynamic brake for the first time in a model (deviating photo)
On order, shipped within 10-15 days
Prototype Even on the inaugural runs, it was evident that the new locomotive not only fulfilled, but also surpassed all expectations. Even when operating at high speeds, it demonstrated low-noise running properties and the boiler always delivered plenty of steam to the balanced fourcylinder engine. In July 1907, the locomotive set a new speed record of 154.4 km/h on a test run between Munich and Augsburg. It was the fastest steam locomotive of its era on the entire European continent. When it was commissioned and completed its sensational record runs in 1906, the S2/6 wore an elegant grey coat of paint. The boiler was clad with a “polished Russian iron jacket”. Model New with energy storage (Digital EXTRA Version) Tender body, chassis and boiler in die-cast zinc Fully mobile tender bogie Reproduction of the model-specific tender bogie Short coupling between locomotive and tender 5-pole skew-wound motor with 2 flywheel drives True-to-scale reproduction of the underframe Fine metal spoke wheels True-to-scale lenght over buffer True-to-original reproduction of the boiler back wall Driver´s cab lighting (possibility to switch on and off with digital system) Numerous metal add-on parts Replicated rivets and hatches Filigree reversing gear
On order, shipped within 10-15 days
Prototype Even on the inaugural runs, it was evident that the new locomotive not only fulfilled, but also surpassed all expectations. Even when operating at high speeds, it demonstrated low-noise running properties and the boiler always delivered plenty of steam to the balanced fourcylinder engine. In July 1907, the locomotive set a new speed record of 154.4 km/h on a test run between Munich and Augsburg. It was the fastest steam locomotive of its era on the entire European continent. When it was commissioned and completed its sensational record runs in 1906, the S 2/6 wore an elegant grey coat of paint. The boiler was clad with a “polished Russian iron jacket”. Model New with energy storage (Digital EXTRA Version) Tender body, chassis and boiler in die-cast zinc Fully mobile tender bogie Reproduction of the model-specific tender bogie Short coupling between locomotive and tender 5-pole skew-wound motor with 2 flywheel drives True-to-scale reproduction of the underframe Fine metal spoke wheels True-to-scale lenght over buffer True-to-original reproduction of the boiler back wall Driver´s cab lighting (possibility to switch on and off with digital system) Numerous metal add-on parts Replicated rivets and hatches Filigree reversing gear
On order, shipped within 10-15 days
Etched cooler grille and fan grille Free-standing handrails Spring buffers Clear view through the driver's cabin Realistic reproduction of the tubular frame bogies incl. axle drive Reproduction of brake rods All specific details of the different series taken into consideration Completely recreated driver's cab Zinc die-cast chassis and gear housing Lights fitted with maintenance-free LEDs Digital EXTRA: complete with the following features that can be digitally controlled: sound, automatic decoupling, driver's cabin lighting, driven fans, shunting light and red light can be individually controlled It is possible to retrospectively convert the V 100 from analogue to digital via a PluX22 interface (only sound functions). Please note that it is not possible to retrospectively convert the digital remotecontrol coupling, the driven fan or the additional light functions.
On order, shipped within 10-15 days
Prototype With the adoption of the 1955 diesel locomotive type program, the foundation for a success story was laid at the Deutsche Bundesbahn (DB) [German Federal Railway] that, to some extent, continues to the present day. The decision was made to develop a diesel locomotive for the secondary railway service with an engine output of between 1,000 and 1,200 HP, the V100 series. Based upon the slightly older V 80, the Bundesbahn Central Office in Munich issued concrete change requests to the MaK Company in order to significantly reduce the costs for the new locomotives. By 1957, this resulting catalogue of requirements thus lead to a largely completed construction of which the Deutsche Bundesbahn ordered six trial locomotives. MaK manufactured a further locomotive at ist own cost in order to also be able to address customers other than DB. With the V100 000, the first of 744 manufactured locomotives of the V100 series left the MaK factory halls in Kiel in March 1958. Like no other locomotive series, it embodied the structural change on the railway that was inevitibly coming. In the middle of Germany's economic miracle, the crimson locomotives shaped the image of the young, modern Deutsche Bundesbahn and sent numerous old steam locomotives to the blast furnaces. The diverse applicability of all three sub-types ensured that the V100 was widely distributed throughout Germany and kept many less frequented secondary railways alive. Approximately a third of all V100 locomotives were equipped with a push-pull train control and multitraction control ex works in order to do away with the time-intensive shunting in train stations where it was necessary to turn the train around. At the beginning of the 1970s, individual locomotives started to be equipped with front-mounted snow ploughs. The first large quantities of the V100.10 (211) were only withdrawn from service at the end of the 1980s. This process only started approximately 10 years later for the V100.20 (212). A reasonably large amount were sold on to other railway companies abroad. Thanks to their reliability and robustness in particular, there are still a few locomotives in operation today after approximately 50 years of operation and are largely being used by private railway companies in Germany. For reasons of differentiation and as the V100 006 was already equipped with a 1,350 HP engine at the point of the first volume production order, all other trial locomotives as well as the recently ordered 1,100 HP locomotives were operated as the V100.10 series. At first glance, it is difficult to notice the differences between the V100.10 series and the trial locomotives. For instance, simple rods were now used in place of the bow-shaped manoeuvring handles and the lower lights were implemented as dual lights. Model Etched cooler grille and fan grille Free-standing handrails Spring buffers Clear view through the driver's cabin Realistic reproduction of the tubular frame bogies incl. axle drive Reproduction of brake rods All specific details of the different series taken into consideration Completely recreated driver's cab Zinc die-cast chassis and gear housing Lights fitted with maintenance-free LEDs Digital EXTRA: complete with the following features that can be digitally controlled: Sound Automatic decoupling Driver's cabin lighting Driven fans Shunting light and red light can be individually controlled It is possible to retrospectively convert the V 100 from analogue to digital via a PluX22 interface (only sound functions). Please note that it is not possible to retrospectively convert the digital remotecontrol coupling, the driven fan or the additional light functions.
On order, lead time to be confirmed
Prototype With the adoption of the 1955 diesel locomotive type program, the foundation for a success story was laid at the Deutsche Bundesbahn (DB) [German Federal Railway] that, to some extent, continues to the present day. The decision was made to develop a diesel locomotive for the secondary railway service with an engine output of between 1,000 and 1,200 HP, the V100 series. Based upon the slightly older V 80, the Bundesbahn Central Office in Munich issued concrete change requests to the MaK Company in order to significantly reduce the costs for the new locomotives. By 1957, this resulting catalogue of requirements thus lead to a largely completed construction of which the Deutsche Bundesbahn ordered six trial locomotives. MaK manufactured a further locomotive at ist own cost in order to also be able to address customers other than DB. With the V100 000, the first of 744 manufactured locomotives of the V100 series left the MaK factory halls in Kiel in March 1958. Like no other locomotive series, it embodied the structural change on the railway that was inevitibly coming. In the middle of Germany's economic miracle, the crimson locomotives shaped the image of the young, modern Deutsche Bundesbahn and sent numerous old steam locomotives to the blast furnaces. The diverse applicability of all three sub-types ensured that the V100 was widely distributed throughout Germany and kept many less frequented secondary railways alive. Approximately a third of all V100 locomotives were equipped with a push-pull train control and multitraction control ex works in order to do away with the time-intensive shunting in train stations where it was necessary to turn the train around. At the beginning of the 1970s, individual locomotives started to be equipped with front-mounted snow ploughs. The first large quantities of the V100.10 (211) were only withdrawn from service at the end of the 1980s. This process only started approximately 10 years later for the V100.20 (212). A reasonably large amount were sold on to other railway companies abroad. Thanks to their reliability and robustness in particular, there are still a few locomotives in operation today after approximately 50 years of operation and are largely being used by private railway companies in Germany. For reasons of differentiation and as the V100 006 was already equipped with a 1,350 HP engine at the point of the first volume production order, all other trial locomotives as well as the recently ordered 1,100 HP locomotives were operated as the V100.10 series. At first glance, it is difficult to notice the differences between the V100.10 series and the trial locomotives. For instance, simple rods were now used in place of the bow-shaped manoeuvring handles and the lower lights were implemented as dual lights. Model Etched cooler grille and fan grille Free-standing handrails Spring buffers Clear view through the driver's cabin Realistic reproduction of the tubular frame bogies incl. axle drive Reproduction of brake rods All specific details of the different series taken into consideration Completely recreated driver's cab Zinc die-cast chassis and gear housing Lights fitted with maintenance-free LEDs Digital EXTRA: complete with the following features that can be digitally controlled: Sound Automatic decoupling Driver's cabin lighting Driven fans Shunting light and red light can be individually controlled It is possible to retrospectively convert the V 100 from analogue to digital via a PluX22 interface (only sound functions). Please note that it is not possible to retrospectively convert the digital remotecontrol coupling, the driven fan or the additional light functions.
On order, shipped within 10-15 days
Prototype With the adoption of the 1955 diesel locomotive type program, the foundation for a success story was laid at the Deutsche Bundesbahn (DB) [German Federal Railway] that, to some extent, continues to the present day. The decision was made to develop a diesel locomotive for the secondary railway service with an engine output of between 1,000 and 1,200 HP, the V100 series. Based upon the slightly older V 80, the Bundesbahn Central Office in Munich issued concrete change requests to the MaK Company in order to significantly reduce the costs for the new locomotives. By 1957, this resulting catalogue of requirements thus lead to a largely completed construction of which the Deutsche Bundesbahn ordered six trial locomotives. MaK manufactured a further locomotive at ist own cost in order to also be able to address customers other than DB. With the V100 000, the first of 744 manufactured locomotives of the V100 series left the MaK factory halls in Kiel in March 1958. Like no other locomotive series, it embodied the structural change on the railway that was inevitibly coming. In the middle of Germany's economic miracle, the crimson locomotives shaped the image of the young, modern Deutsche Bundesbahn and sent numerous old steam locomotives to the blast furnaces. The diverse applicability of all three sub-types ensured that the V100 was widely distributed throughout Germany and kept many less frequented secondary railways alive. Approximately a third of all V100 locomotives were equipped with a push-pull train control and multitraction control ex works in order to do away with the time-intensive shunting in train stations where it was necessary to turn the train around. At the beginning of the 1970s, individual locomotives started to be equipped with front-mounted snow ploughs. The first large quantities of the V100.10 (211) were only withdrawn from service at the end of the 1980s. This process only started approximately 10 years later for the V100.20 (212). A reasonably large amount were sold on to other railway companies abroad. Thanks to their reliability and robustness in particular, there are still a few locomotives in operation today after approximately 50 years of operation and are largely being used by private railway companies in Germany. For reasons of differentiation and as the V100 006 was already equipped with a 1,350 HP engine at the point of the first volume production order, all other trial locomotives as well as the recently ordered 1,100 HP locomotives were operated as the V100.10 series. At first glance, it is difficult to notice the differences between the V100.10 series and the trial locomotives. For instance, simple rods were now used in place of the bow-shaped manoeuvring handles and the lower lights were implemented as dual lights. Model Etched cooler grille and fan grille Free-standing handrails Spring buffers Clear view through the driver's cabin Realistic reproduction of the tubular frame bogies incl. axle drive Reproduction of brake rods All specific details of the different series taken into consideration Completely recreated driver's cab Zinc die-cast chassis and gear housing Lights fitted with maintenance-free LEDs Digital EXTRA: complete with the following features that can be digitally controlled: Sound Automatic decoupling Driver's cabin lighting Driven fans Shunting light and red light can be individually controlled It is possible to retrospectively convert the V 100 from analogue to digital via a PluX22 interface (only sound functions). Please note that it is not possible to retrospectively convert the digital remotecontrol coupling, the driven fan or the additional light functions.
On order, shipped within 10-15 days
Prototype With the adoption of the 1955 diesel locomotive type program, the foundation for a success story was laid at the Deutsche Bundesbahn (DB) [German Federal Railway] that, to some extent, continues to the present day. The decision was made to develop a diesel locomotive for the secondary railway service with an engine output of between 1,000 and 1,200 HP, the V100 series. Based upon the slightly older V 80, the Bundesbahn Central Office in Munich issued concrete change requests to the MaK Company in order to significantly reduce the costs for the new locomotives. By 1957, this resulting catalogue of requirements thus lead to a largely completed construction of which the Deutsche Bundesbahn ordered six trial locomotives. MaK manufactured a further locomotive at ist own cost in order to also be able to address customers other than DB. With the V100 000, the first of 744 manufactured locomotives of the V100 series left the MaK factory halls in Kiel in March 1958. Like no other locomotive series, it embodied the structural change on the railway that was inevitibly coming. In the middle of Germany's economic miracle, the crimson locomotives shaped the image of the young, modern Deutsche Bundesbahn and sent numerous old steam locomotives to the blast furnaces. The diverse applicability of all three sub-types ensured that the V100 was widely distributed throughout Germany and kept many less frequented secondary railways alive. Approximately a third of all V100 locomotives were equipped with a push-pull train control and multitraction control ex works in order to do away with the time-intensive shunting in train stations where it was necessary to turn the train around. At the beginning of the 1970s, individual locomotives started to be equipped with front-mounted snow ploughs. The first large quantities of the V100.10 (211) were only withdrawn from service at the end of the 1980s. This process only started approximately 10 years later for the V100.20 (212). A reasonably large amount were sold on to other railway companies abroad. Thanks to their reliability and robustness in particular, there are still a few locomotives in operation today after approximately 50 years of operation and are largely being used by private railway companies in Germany. For reasons of differentiation and as the V100 006 was already equipped with a 1,350 HP engine at the point of the first volume production order, all other trial locomotives as well as the recently ordered 1,100 HP locomotives were operated as the V100.10 series. At first glance, it is difficult to notice the differences between the V100.10 series and the trial locomotives. For instance, simple rods were now used in place of the bow-shaped manoeuvring handles and the lower lights were implemented as dual lights. Model Etched cooler grille and fan grille Free-standing handrails Spring buffers Clear view through the driver's cabin Realistic reproduction of the tubular frame bogies incl. axle drive Reproduction of brake rods All specific details of the different series taken into consideration Completely recreated driver's cab Zinc die-cast chassis and gear housing Lights fitted with maintenance-free LEDs Digital EXTRA: complete with the following features that can be digitally controlled: Sound Automatic decoupling Driver's cabin lighting Driven fans Shunting light and red light can be individually controlled It is possible to retrospectively convert the V 100 from analogue to digital via a PluX22 interface (only sound functions). Please note that it is not possible to retrospectively convert the digital remotecontrol coupling, the driven fan or the additional light functions.
On order, shipped within 10-15 days
Prototype With the adoption of the 1955 diesel locomotive type program, the foundation for a success story was laid at the Deutsche Bundesbahn (DB) [German Federal Railway] that, to some extent, continues to the present day. The decision was made to develop a diesel locomotive for the secondary railway service with an engine output of between 1,000 and 1,200 HP, the V100 series. Based upon the slightly older V 80, the Bundesbahn Central Office in Munich issued concrete change requests to the MaK Company in order to significantly reduce the costs for the new locomotives. By 1957, this resulting catalogue of requirements thus lead to a largely completed construction of which the Deutsche Bundesbahn ordered six trial locomotives. MaK manufactured a further locomotive at ist own cost in order to also be able to address customers other than DB. With the V100 000, the first of 744 manufactured locomotives of the V100 series left the MaK factory halls in Kiel in March 1958. Like no other locomotive series, it embodied the structural change on the railway that was inevitibly coming. In the middle of Germany's economic miracle, the crimson locomotives shaped the image of the young, modern Deutsche Bundesbahn and sent numerous old steam locomotives to the blast furnaces. The diverse applicability of all three sub-types ensured that the V100 was widely distributed throughout Germany and kept many less frequented secondary railways alive. Approximately a third of all V100 locomotives were equipped with a push-pull train control and multitraction control ex works in order to do away with the time-intensive shunting in train stations where it was necessary to turn the train around. At the beginning of the 1970s, individual locomotives started to be equipped with front-mounted snow ploughs. The first large quantities of the V100.10 (211) were only withdrawn from service at the end of the 1980s. This process only started approximately 10 years later for the V100.20 (212). A reasonably large amount were sold on to other railway companies abroad. Thanks to their reliability and robustness in particular, there are still a few locomotives in operation today after approximately 50 years of operation and are largely being used by private railway companies in Germany. For reasons of differentiation and as the V100 006 was already equipped with a 1,350 HP engine at the point of the first volume production order, all other trial locomotives as well as the recently ordered 1,100 HP locomotives were operated as the V100.10 series. At first glance, it is difficult to notice the differences between the V100.10 series and the trial locomotives. For instance, simple rods were now used in place of the bow-shaped manoeuvring handles and the lower lights were implemented as dual lights. Model Etched cooler grille and fan grille Free-standing handrails Spring buffers Clear view through the driver's cabin Realistic reproduction of the tubular frame bogies incl. axle drive Reproduction of brake rods All specific details of the different series taken into consideration Completely recreated driver's cab Zinc die-cast chassis and gear housing Lights fitted with maintenance-free LEDs Digital EXTRA: complete with the following features that can be digitally controlled: Sound Automatic decoupling Driver's cabin lighting Driven fans Shunting light and red light can be individually controlled It is possible to retrospectively convert the V 100 from analogue to digital via a PluX22 interface (only sound functions). Please note that it is not possible to retrospectively convert the digital remotecontrol coupling, the driven fan or the additional light functions.
On order, shipped within 10-15 days
Prototype The Deutsche Reichsbahn Gesellschaft’s (DRG) procurement process for standardised freight locomotives mirrored its earlier evaluations of the 01 and 02 series. According to the specification, the new locomotive had to be capable of hauling goods trains weighing up to 1,200 metric tons over low mountain ranges, with an axle pressure of 20 tons. The maximum speed was set at 70 km/h for the pre-series locomotives. In 1926, to determine the most economical design, orders were placed with various locomotive manufacturers for the construction of 10 locomotives each of the 43 (two-cylinder engine) and 44 (three-cylinder engine) series. In addition to allocating the locomotives to other railway depots, a direct comparison was made between the 43 and 44 at the Pressig-Rothenkirchen depot. The respective merits and shortcomings of both series were determined via tests on the Franconian Forest Railway. The comparison of the two series did not initially favour the more powerful 44 series – the increased economy offered by the two-cylinder type 43 locomotive won the day. However, as Germany emerged from the shadow of the Great Depression in the mid-1930s, calls for more powerful freight locomotives grew louder. The experience gained ten years earlier with the type 44 was still fresh in the memory. The type 44 013-065 locomotives were consequently developed as an intermediate series – in part based on the experience gained in steam engine construction since 1925. In 1938 (from 44 066), full series production finally began. By 1949, a total of 1989 type 44 locomotives had been built at various locomotive factories in Germany and abroad. The new models lived up to all expectations and henceforth became the backbone of the goods train fleet. Model Detailed and movable internal engine, with two crop axles AC version with latest pickup generation Boiler, driver's cab and tender made of high-quality, impact-resistant plastic Perforated underframe and spoked wheels in die-cast zinc Standard shaft rear with link guide Illuminated driver's cab (Version Digital EXTRA) Fire flickering (Version Digital EXTRA) Sound decoder, either built in or as a retrofit option Smoke generator can be retrofitted Close coupling between locomotive and tender Perfectly replicated back boilerplate Drive in the tender Single axle bearing Many extra mounted parts True to original wagner smoke deflectors Tender 2'2' T32
On order, shipped within 10-15 days
Prototype The Deutsche Reichsbahn Gesellschaft’s (DRG) procurement process for standardised freight locomotives mirrored its earlier evaluations of the 01 and 02 series. According to the specification, the new locomotive had to be capable of hauling goods trains weighing up to 1,200 metric tons over low mountain ranges, with an axle pressure of 20 tons. The maximum speed was set at 70 km/h for the pre-series locomotives. In 1926, to determine the most economical design, orders were placed with various locomotive manufacturers for the construction of 10 locomotives each of the 43 (two-cylinder engine) and 44 (three-cylinder engine) series. In addition to allocating the locomotives to other railway depots, a direct comparison was made between the 43 and 44 at the Pressig-Rothenkirchen depot. The respective merits and shortcomings of both series were determined via tests on the Franconian Forest Railway. The comparison of the two series did not initially favour the more powerful 44 series – the increased economy offered by the two-cylinder type 43 locomotive won the day. However, as Germany emerged from the shadow of the Great Depression in the mid-1930s, calls for more powerful freight locomotives grew louder. The experience gained ten years earlier with the type 44 was still fresh in the memory. The type 44 013-065 locomotives were consequently developed as an intermediate series – in part based on the experience gained in steam engine construction since 1925. In 1938 (from 44 066), full series production finally began. By 1949, a total of 1989 type 44 locomotives had been built at various locomotive factories in Germany and abroad. The new models lived up to all expectations and henceforth became the backbone of the goods train fleet. Model Detailed and movable internal engine, with two crop axles AC version with latest pickup generation Boiler, driver's cab and tender made of high-quality, impact-resistant plastic Perforated underframe and spoked wheels in die-cast zinc Standard shaft rear with link guide Illuminated driver's cab (Version Digital EXTRA) Fire flickering (Version Digital EXTRA) Sound decoder, either built in or as a retrofit option Smoke generator can be retrofitted Close coupling between locomotive and tender Perfectly replicated back boilerplate Drive in the tender Single axle bearing Many extra mounted parts True to original wagner smoke deflectors Tender 2'2' T32
On order, shipped within 10-15 days
Prototype The Deutsche Reichsbahn Gesellschaft’s (DRG) procurement process for standardised freight locomotives mirrored its earlier evaluations of the 01 and 02 series. According to the specification, the new locomotive had to be capable of hauling goods trains weighing up to 1,200 metric tons over low mountain ranges, with an axle pressure of 20 tons. The maximum speed was set at 70 km/h for the pre-series locomotives. In 1926, to determine the most economical design, orders were placed with various locomotive manufacturers for the construction of 10 locomotives each of the 43 (two-cylinder engine) and 44 (three-cylinder engine) series. In addition to allocating the locomotives to other railway depots, a direct comparison was made between the 43 and 44 at the Pressig-Rothenkirchen depot. The respective merits and shortcomings of both series were determined via tests on the Franconian Forest Railway. The comparison of the two series did not initially favour the more powerful 44 series – the increased economy offered by the two-cylinder type 43 locomotive won the day. However, as Germany emerged from the shadow of the Great Depression in the mid-1930s, calls for more powerful freight locomotives grew louder. The experience gained ten years earlier with the type 44 was still fresh in the memory. The type 44 013-065 locomotives were consequently developed as an intermediate series – in part based on the experience gained in steam engine construction since 1925. In 1938 (from 44 066), full series production finally began. By 1949, a total of 1989 type 44 locomotives had been built at various locomotive factories in Germany and abroad. The new models lived up to all expectations and henceforth became the backbone of the goods train fleet. Model Detailed and movable internal engine, with two crop axles AC version with latest pickup generation Boiler, driver's cab and tender made of high-quality, impact-resistant plastic Perforated underframe and spoked wheels in die-cast zinc Standard shaft rear with link guide Illuminated driver's cab (Version Digital EXTRA) Fire flickering (Version Digital EXTRA) Sound decoder, either built in or as a retrofit option Smoke generator can be retrofitted Close coupling between locomotive and tender Perfectly replicated back boilerplate Drive in the tender Single axle bearing Many extra mounted parts True to original wagner smoke deflectors Tender 2'2' T32
On order, shipped within 10-15 days
Prototype The Deutsche Reichsbahn Gesellschaft’s (DRG) procurement process for standardised freight locomotives mirrored its earlier evaluations of the 01 and 02 series. According to the specification, the new locomotive had to be capable of hauling goods trains weighing up to 1,200 metric tons over low mountain ranges, with an axle pressure of 20 tons. The maximum speed was set at 70 km/h for the pre-series locomotives. In 1926, to determine the most economical design, orders were placed with various locomotive manufacturers for the construction of 10 locomotives each of the 43 (two-cylinder engine) and 44 (three-cylinder engine) series. In addition to allocating the locomotives to other railway depots, a direct comparison was made between the 43 and 44 at the Pressig-Rothenkirchen depot. The respective merits and shortcomings of both series were determined via tests on the Franconian Forest Railway. The comparison of the two series did not initially favour the more powerful 44 series – the increased economy offered by the two-cylinder type 43 locomotive won the day. However, as Germany emerged from the shadow of the Great Depression in the mid-1930s, calls for more powerful freight locomotives grew louder. The experience gained ten years earlier with the type 44 was still fresh in the memory. The type 44 013-065 locomotives were consequently developed as an intermediate series – in part based on the experience gained in steam engine construction since 1925. In 1938 (from 44 066), full series production finally began. By 1949, a total of 1989 type 44 locomotives had been built at various locomotive factories in Germany and abroad. The new models lived up to all expectations and henceforth became the backbone of the goods train fleet. Model Detailed and movable internal engine, with two crop axles Boiler, driver's cab and tender made of high-quality, impact-resistant plastic Perforated underframe and spoked wheels in die-cast zinc Standard shaft rear with link guide Illuminated driver's cab (Version Digital EXTRA) Fire flickering (Version Digital EXTRA) Sound decoder, either built in or as a retrofit option Smoke generator can be retrofitted Close coupling between locomotive and tender Perfectly replicated back boilerplate Drive in the tender Single axle bearing Many extra mounted parts True to original witte smoke deflectors Tender 2'2' T34
On order, shipped within 10-15 days
Prototype The Deutsche Reichsbahn Gesellschaft’s (DRG) procurement process for standardised freight locomotives mirrored its earlier evaluations of the 01 and 02 series. According to the specification, the new locomotive had to be capable of hauling goods trains weighing up to 1,200 metric tons over low mountain ranges, with an axle pressure of 20 tons. The maximum speed was set at 70 km/h for the pre-series locomotives. In 1926, to determine the most economical design, orders were placed with various locomotive manufacturers for the construction of 10 locomotives each of the 43 (two-cylinder engine) and 44 (three-cylinder engine) series. In addition to allocating the locomotives to other railway depots, a direct comparison was made between the 43 and 44 at the Pressig-Rothenkirchen depot. The respective merits and shortcomings of both series were determined via tests on the Franconian Forest Railway. The comparison of the two series did not initially favour the more powerful 44 series – the increased economy offered by the two-cylinder type 43 locomotive won the day. However, as Germany emerged from the shadow of the Great Depression in the mid-1930s, calls for more powerful freight locomotives grew louder. The experience gained ten years earlier with the type 44 was still fresh in the memory. The type 44 013-065 locomotives were consequently developed as an intermediate series – in part based on the experience gained in steam engine construction since 1925. In 1938 (from 44 066), full series production finally began. By 1949, a total of 1989 type 44 locomotives had been built at various locomotive factories in Germany and abroad. The new models lived up to all expectations and henceforth became the backbone of the goods train fleet. Model Detailed and movable internal engine, with two crop axles Boiler, driver's cab and tender made of high-quality, impact-resistant plastic Perforated underframe and spoked wheels in die-cast zinc Standard shaft rear with link guide Illuminated driver's cab (Version Digital EXTRA) Fire flickering (Version Digital EXTRA) Sound decoder, either built in or as a retrofit option Smoke generator can be retrofitted Close coupling between locomotive and tender Perfectly replicated back boilerplate Drive in the tender Single axle bearing Many extra mounted parts True to original witte smoke deflectors Tender 2'2' T34
On order, shipped within 10-15 days
Etched cooler grille and fan grille Free-standing handrails Spring buffers Clear view through the driver's cabin Realistic reproduction of the tubular frame bogies incl. axle drive Reproduction of brake rods All specific details of the different series taken into consideration Completely recreated driver's cab Zinc die-cast chassis and gear housing Lights fitted with maintenance-free LEDs Digital EXTRA: complete with the following features that can be digitally controlled: sound, automatic decoupling, driver's cabin lighting, driven fans, shunting light and red light can be individually controlled It is possible to retrospectively convert the V 100 from analogue to digital via a PluX22 interface (only sound functions). Please note that it is not possible to retrospectively convert the digital remotecontrol coupling, the driven fan or the additional light functions.
On order, shipped within 10-15 days
Etched cooler grille and fan grille Free-standing handrails Spring buffers Clear view through the driver's cabin Realistic reproduction of the tubular frame bogies incl. axle drive Reproduction of brake rods All specific details of the different series taken into consideration Completely recreated driver's cab Zinc die-cast chassis and gear housing Lights fitted with maintenance-free LEDs Digital EXTRA: complete with the following features that can be digitally controlled: sound, automatic decoupling, driver's cabin lighting, driven fans, shunting light and red light can be individually controlled It is possible to retrospectively convert the V 100 from analogue to digital via a PluX22 interface (only sound functions). Please note that it is not possible to retrospectively convert the digital remotecontrol coupling, the driven fan or the additional light functions.
On order, shipped within 10-15 days
Etched cooler grille and fan grille Free-standing handrails Spring buffers Clear view through the driver's cabin Realistic reproduction of the tubular frame bogies incl. axle drive Reproduction of brake rods All specific details of the different series taken into consideration Completely recreated driver's cab Zinc die-cast chassis and gear housing Lights fitted with maintenance-free LEDs Digital EXTRA: complete with the following features that can be digitally controlled: sound, automatic decoupling, driver's cabin lighting, driven fans, shunting light and red light can be individually controlled It is possible to retrospectively convert the V 100 from analogue to digital via a PluX22 interface (only sound functions). Please note that it is not possible to retrospectively convert the digital remotecontrol coupling, the driven fan or the additional light functions.
On order, shipped within 10-15 days
Etched cooler grille and fan grille Free-standing handrails Spring buffers Clear view through the driver's cabin Realistic reproduction of the tubular frame bogies incl. axle drive Reproduction of brake rods All specific details of the different series taken into consideration Completely recreated driver's cab Zinc die-cast chassis and gear housing Lights fitted with maintenance-free LEDs Digital EXTRA: complete with the following features that can be digitally controlled: sound, automatic decoupling, driver's cabin lighting, driven fans, shunting light and red light can be individually controlled It is possible to retrospectively convert the V 100 from analogue to digital via a PluX22 interface (only sound functions). Please note that it is not possible to retrospectively convert the digital remotecontrol coupling, the driven fan or the additional light functions.
On order, shipped within 10-15 days
Prototype From 1958, the German Federal Railway (Deutsche Bundesbahn) equipped 50 locomotives of the 01 series with the so-called Type I high-performance boiler. Designed according to the construction principles developed by Friedrich Witte, this boiler type had previously been successfully installed in the Bundesbahn’s series BR 01.10 locomotives. The new, fully welded boiler had a significantly better ratio of radiant to tubular heating surface (1:8.8 compared to 1:13.54 in the old-style boiler), which was mainly due to the built-in combustion chamber. To put this in figures: while the evaporation surface of the high-efficiency boiler was 54 m² smaller than that of its predecessor, this was compensated for by an 18 kg/m²h increase in the heating surface load. This made it possible to achieve the same boiler output with significantly lower fuel consumption. Visually, the conversion to the high-performance boiler resulted in locomotives that looked far neater and more modern. In addition, some adjustments were made with regard to occupational health and safety. The pipework was routed in cleaner lines. The sandbox was removed from the top of the boiler. The running board was replaced by a wide circulating plate and handles were integrated into the wind deflectors. On the technical side, the Knorr surface preheater was replaced by a type 57 mixing preheater. The locomotives 01 217 and 223 were fitted with experimental roller bearings in the driving and coupling rods, similar to those used in the BR 01.10. In operational terms, the new locomotives were deployed alongside the “old-style boiler” locomotives from traditional maintenance depots. The use of both 01 variants by DB only came to an end when steam locomotive maintenance finally ceased at the Hof railway depot in 1973. Model Impact resistant body and chassis Perforated underframe in die-cast zinc Die-cast zinc spoked wheels Fine metal drive and coupling rods True to era lighting Drive in the tender for optimal driving characteristics Close coupling between locomotive and tender Standard shaft rear with link guide True to original boiler rear wall Metal axle bearing True to scale axle base New sound
On order, shipped within 10-15 days
Prototype From 1958, the German Federal Railway (Deutsche Bundesbahn) equipped 50 locomotives of the 01 series with the so-called Type I high-performance boiler. Designed according to the construction principles developed by Friedrich Witte, this boiler type had previously been successfully installed in the Bundesbahn’s series BR 01.10 locomotives. The new, fully welded boiler had a significantly better ratio of radiant to tubular heating surface (1:8.8 compared to 1:13.54 in the old-style boiler), which was mainly due to the built-in combustion chamber. To put this in figures: while the evaporation surface of the high-efficiency boiler was 54 m² smaller than that of its predecessor, this was compensated for by an 18 kg/m²h increase in the heating surface load. This made it possible to achieve the same boiler output with significantly lower fuel consumption. Visually, the conversion to the high-performance boiler resulted in locomotives that looked far neater and more modern. In addition, some adjustments were made with regard to occupational health and safety. The pipework was routed in cleaner lines. The sandbox was removed from the top of the boiler. The running board was replaced by a wide circulating plate and handles were integrated into the wind deflectors. On the technical side, the Knorr surface preheater was replaced by a type 57 mixing preheater. The locomotives 01 217 and 223 were fitted with experimental roller bearings in the driving and coupling rods, similar to those used in the BR 01.10. In operational terms, the new locomotives were deployed alongside the “old-style boiler” locomotives from traditional maintenance depots. The use of both 01 variants by DB only came to an end when steam locomotive maintenance finally ceased at the Hof railway depot in 1973. Model Impact resistant body and chassis Perforated underframe in die-cast zinc Die-cast zinc spoked wheels Fine metal drive and coupling rods True to era lighting Drive in the tender for optimal driving characteristics Close coupling between locomotive and tender Standard shaft rear with link guide True to original boiler rear wall Metal axle bearing True to scale axle base New sound
On order, shipped within 10-15 days
Prototype From 1958, the German Federal Railway (Deutsche Bundesbahn) equipped 50 locomotives of the 01 series with the so-called Type I high-performance boiler. Designed according to the construction principles developed by Friedrich Witte, this boiler type had previously been successfully installed in the Bundesbahn’s series BR 01.10 locomotives. The new, fully welded boiler had a significantly better ratio of radiant to tubular heating surface (1:8.8 compared to 1:13.54 in the old-style boiler), which was mainly due to the built-in combustion chamber. To put this in figures: while the evaporation surface of the high-efficiency boiler was 54 m² smaller than that of its predecessor, this was compensated for by an 18 kg/m²h increase in the heating surface load. This made it possible to achieve the same boiler output with significantly lower fuel consumption. Visually, the conversion to the high-performance boiler resulted in locomotives that looked far neater and more modern. In addition, some adjustments were made with regard to occupational health and safety. The pipework was routed in cleaner lines. The sandbox was removed from the top of the boiler. The running board was replaced by a wide circulating plate and handles were integrated into the wind deflectors. On the technical side, the Knorr surface preheater was replaced by a type 57 mixing preheater. The locomotives 01 217 and 223 were fitted with experimental roller bearings in the driving and coupling rods, similar to those used in the BR 01.10. In operational terms, the new locomotives were deployed alongside the “old-style boiler” locomotives from traditional maintenance depots. The use of both 01 variants by DB only came to an end when steam locomotive maintenance finally ceased at the Hof railway depot in 1973. Model Impact resistant body and chassis Perforated underframe in die-cast zinc Die-cast zinc spoked wheels Fine metal drive and coupling rods True to era lighting Drive in the tender for optimal driving characteristics Close coupling between locomotive and tender Standard shaft rear with link guide True to original boiler rear wall Metal axle bearing True to scale axle base New sound
On order, shipped within 10-15 days
Prototype From 1958, the German Federal Railway (Deutsche Bundesbahn) equipped 50 locomotives of the 01 series with the so-called Type I high-performance boiler. Designed according to the construction principles developed by Friedrich Witte, this boiler type had previously been successfully installed in the Bundesbahn’s series BR 01.10 locomotives. The new, fully welded boiler had a significantly better ratio of radiant to tubular heating surface (1:8.8 compared to 1:13.54 in the old-style boiler), which was mainly due to the built-in combustion chamber. To put this in figures: while the evaporation surface of the high-efficiency boiler was 54 m² smaller than that of its predecessor, this was compensated for by an 18 kg/m²h increase in the heating surface load. This made it possible to achieve the same boiler output with significantly lower fuel consumption. Visually, the conversion to the high-performance boiler resulted in locomotives that looked far neater and more modern. In addition, some adjustments were made with regard to occupational health and safety. The pipework was routed in cleaner lines. The sandbox was removed from the top of the boiler. The running board was replaced by a wide circulating plate and handles were integrated into the wind deflectors. On the technical side, the Knorr surface preheater was replaced by a type 57 mixing preheater. The locomotives 01 217 and 223 were fitted with experimental roller bearings in the driving and coupling rods, similar to those used in the BR 01.10. In operational terms, the new locomotives were deployed alongside the “old-style boiler” locomotives from traditional maintenance depots. The use of both 01 variants by DB only came to an end when steam locomotive maintenance finally ceased at the Hof railway depot in 1973. Model Impact resistant body and chassis Perforated underframe in die-cast zinc Die-cast zinc spoked wheels Fine metal drive and coupling rods True to era lighting Drive in the tender for optimal driving characteristics Close coupling between locomotive and tender Standard shaft rear with link guide True to original boiler rear wall Metal axle bearing True to scale axle base New sound
On order, lead time to be confirmed
Prototype Before the class BR 01 gained its reputation as “the” German express locomotive, the companies Borsig (01 001-008) and AEG (01 009-010) delivered a total of 10 pre-series locomotives to the Deutsche Reichsbahn Gesellschaft (DRG). The first model was the 01 008, which is still preserved today and was handed over to the DRG on 10 January 1926. However, these locomotives were ahead of their time, as many lines and railway depots were not yet prepared for an axle load of 20 t. As a result, the operating distances remained severely limited in the first few years of use. This in turn made the testing phase for the new locomotives an extremely drawn-out process. The most striking difference to the later series locomotives was the visibly longer cab, which remained a feature of the first ten 01’s. There were also differences in the design of the frame and many other details. Model Boiler, driver's cab and tender made of high-quality, impact-resistant plastic Perforated underframe and spoked wheels in die-cast zinc Sound decoder, either built in or as a retrofit option Illuminated driver's cab True-to epoch lighting, multipart lamp housing Standard shaft rear with link guide Close coupling between locomotive and tender Perfectly replicated back boilerplate Extra mounted steps Navigable minimum radius: The models of BR 01 are technically suitable for R 360. For best driving characteristics we recommend the use on R 420.
On order, shipped within 10-15 days