H0 and N rolling stock, lighting and cable cars
Brawa, model railways made with care
Locomotives, coaches and wagons in H0 and N, plus street lights, cable cars, bulbs and wiring: the world of a family firm from Waiblingen.
- 1375items in the shop
- H0 and Nthe scales in the range
- 1948the year of the founding

What makes Brawa
- A family firm since 1948: founded by Artur Braun in Waiblingen, in southern Germany, Brawa is run today by the third generation of the family.
- Love of detail: individually fitted handrails, sprung buffers, crisp printing: every model starts from measurements and photographs of the original and a study of the construction drawings.
- Sturdy locomotives: most are largely die-cast zinc, for weight and robustness, for DC or AC, with sound and, on steam locomotives, smoke.
- Cable cars and lighting: H0 cable cars are a house speciality, starting with the Nebelhorn cableway in Oberstdorf; lamps and signals follow, with load-bearing parts made of brass or etched sheet.
The Brawa families
Rolling stock
210 itemsLocomotivesLocomotives in H0 and N, from the DB AG TRAXX BR 147 to the DR BR 132.See the items
56 itemsRailcars and multiple unitsTWINDEXX Vario double-deck trains in N, DRG VT 137 diesel railcar in H0.See the items
360 itemsPassenger coachesDB express coaches, SBB coaches and complete trains in H0 and N.See the items
448 itemsFreight wagonsCovered wagons, container wagons and luggage vans, including the SBB K2 "Ovomaltine".See the itemsScenery and cable cars
117 itemsLighting and scenery accessoriesWooden-mast lights, park lanterns and LED wall lights, clocks and telephone boxes.See the items
12 itemsCable carsNebelhorn, Hahnenkamm, Kanzelwand, Titlis and chairlift, in H0 and N.See the itemsBulbs and wiring
All Brawa items
Prototype Up to the twenties of the previous century, goods trains of all German railway administrations were operated with manual brakes. In addition to the locomotive personnel, the crew of the train therefore included a chief train conductor as the highest authority, a master packer, train conductor and shunter as well as several brakeman. These persons were responsible for braking the train, for the shunting work during stops en route, and the exchange and processing of freight documents of the transported goods. For this purpose, a special accompanying wagon was carried along behind the locomotive that served as a rolling working and recreation place. Only the brakeman had to stay in one of the brakeman's cabins during the trip. Completing the own development, the KPEV (Royal Prussian Railway Administration) procured luggage wagons ("Pwg") according to master drawing pr IIa 13a for the first time in 1913/14. After the end of World War I, this design was selected as replacement of the old or missing accompanying wagons of the most German Länder railway operators. So, over 7,000 "Pwg" were built according to the 2nd revised edition of the master drawing until 1929 and spread not only in the former KPEV region, but also in Baden, Bavaria, Wuerttemberg, and Saxony. Starting at the end of the thirties, the DRB removed the through-going running boards and handlebars, allegedly due to an attempted robbery of a train. Additional structural alterations even before the outbreak of the war included reinforcements of the wagon body frame and the removal of the window in the storage space door. Model True to original construction differences True to era lighting, e.g. gas or electric lighting True to era roof fittings True to original car bottom Metal axle holders Bogie with three-point support Individually mounted axle box cover Brake blocks in wheel plane Individually mounted axle brake rod Continuous and separate steps Individually mounted brake systems Perforated car body supports
On order, shipped within 10-15 days
Prototype Up to the twenties of the previous century, goods trains of all German railway administrations were operated with manual brakes. In addition to the locomotive personnel, the crew of the train therefore included a chief train conductor as the highest authority, a master packer, train conductor and shunter as well as several brakeman. These persons were responsible for braking the train, for the shunting work during stops en route, and the exchange and processing of freight documents of the transported goods. For this purpose, a special accompanying wagon was carried along behind the locomotive that served as a rolling working and recreation place. Only the brakeman had to stay in one of the brakeman's cabins during the trip. Completing the own development, the KPEV (Royal Prussian Railway Administration) procured luggage wagons ("Pwg") according to master drawing pr IIa 13a for the first time in 1913/14. After the end of World War I, this design was selected as replacement of the old or missing accompanying wagons of the most German Länder railway operators. So, over 7,000 "Pwg" were built according to the 2nd revised edition of the master drawing until 1929 and spread not only in the former KPEV region, but also in Baden, Bavaria, Wuerttemberg, and Saxony. Starting at the end of the thirties, the DRB removed the through-going running boards and handlebars, allegedly due to an attempted robbery of a train. Additional structural alterations even before the outbreak of the war included reinforcements of the wagon body frame and the removal of the window in the storage space door. Model True to original construction differences True to era lighting, e.g. gas or electric lighting True to era roof fittings True to original car bottom Metal axle holders Bogie with three-point support Individually mounted axle box cover Brake blocks in wheel plane Individually mounted axle brake rod Continuous and separate steps Individually mounted brake systems Perforated car body supports
On order, shipped within 10-15 days
Prototype Up to the twenties of the previous century, goods trains of all German railway administrations were operated with manual brakes. In addition to the locomotive personnel, the crew of the train therefore included a chief train conductor as the highest authority, a master packer, train conductor and shunter as well as several brakeman. These persons were responsible for braking the train, for the shunting work during stops en route, and the exchange and processing of freight documents of the transported goods. For this purpose, a special accompanying wagon was carried along behind the locomotive that served as a rolling working and recreation place. Only the brakeman had to stay in one of the brakeman's cabins during the trip. Completing the own development, the KPEV (Royal Prussian Railway Administration) procured luggage wagons ("Pwg") according to master drawing pr IIa 13a for the first time in 1913/14. After the end of World War I, this design was selected as replacement of the old or missing accompanying wagons of the most German Länder railway operators. So, over 7,000 "Pwg" were built according to the 2nd revised edition of the master drawing until 1929 and spread not only in the former KPEV region, but also in Baden, Bavaria, Wuerttemberg, and Saxony. Starting at the end of the thirties, the DRB removed the through-going running boards and handlebars, allegedly due to an attempted robbery of a train. Additional structural alterations even before the outbreak of the war included reinforcements of the wagon body frame and the removal of the window in the storage space door. Model True to original construction differences True to era lighting, e.g. gas or electric lighting True to era roof fittings True to original car bottom Metal axle holders Bogie with three-point support Individually mounted axle box cover Brake blocks in wheel plane Individually mounted axle brake rod Continuous and separate steps Individually mounted brake systems Perforated car body supports
On order, shipped within 10-15 days
Prototype Up to the twenties of the previous century, goods trains of all German railway administrations were operated with manual brakes. In addition to the locomotive personnel, the crew of the train therefore included a chief train conductor as the highest authority, a master packer, train conductor and shunter as well as several brakeman. These persons were responsible for braking the train, for the shunting work during stops en route, and the exchange and processing of freight documents of the transported goods. For this purpose, a special accompanying wagon was carried along behind the locomotive that served as a rolling working and recreation place. Only the brakeman had to stay in one of the brakeman's cabins during the trip. Completing the own development, the KPEV (Royal Prussian Railway Administration) procured luggage wagons ("Pwg") according to master drawing pr IIa 13a for the first time in 1913/14. After the end of World War I, this design was selected as replacement of the old or missing accompanying wagons of the most German Länder railway operators. So, over 7,000 "Pwg" were built according to the 2nd revised edition of the master drawing until 1929 and spread not only in the former KPEV region, but also in Baden, Bavaria, Wuerttemberg, and Saxony. Starting at the end of the thirties, the DRB removed the through-going running boards and handlebars, allegedly due to an attempted robbery of a train. Additional structural alterations even before the outbreak of the war included reinforcements of the wagon body frame and the removal of the window in the storage space door. Model True to original construction differences True to era lighting, e.g. gas or electric lighting True to era roof fittings True to original car bottom Metal axle holders Bogie with three-point support Individually mounted axle box cover Brake blocks in wheel plane Individually mounted axle brake rod Continuous and separate steps Individually mounted brake systems Perforated car body supports
On order, shipped within 10-15 days
Prototype Up to the twenties of the previous century, goods trains of all German railway administrations were operated with manual brakes. In addition to the locomotive personnel, the crew of the train therefore included a chief train conductor as the highest authority, a master packer, train conductor and shunter as well as several brakeman. These persons were responsible for braking the train, for the shunting work during stops en route, and the exchange and processing of freight documents of the transported goods. For this purpose, a special accompanying wagon was carried along behind the locomotive that served as a rolling working and recreation place. Only the brakeman had to stay in one of the brakeman's cabins during the trip. Completing the own development, the KPEV (Royal Prussian Railway Administration) procured luggage wagons ("Pwg") according to master drawing pr IIa 13a for the first time in 1913/14. After the end of World War I, this design was selected as replacement of the old or missing accompanying wagons of the most German Länder railway operators. So, over 7,000 "Pwg" were built according to the 2nd revised edition of the master drawing until 1929 and spread not only in the former KPEV region, but also in Baden, Bavaria, Wuerttemberg, and Saxony. Starting at the end of the thirties, the DRB removed the through-going running boards and handlebars, allegedly due to an attempted robbery of a train. Additional structural alterations even before the outbreak of the war included reinforcements of the wagon body frame and the removal of the window in the storage space door. Model True to original construction differences True to era lighting, e.g. gas or electric lighting True to era roof fittings True to original car bottom Metal axle holders Bogie with three-point support Individually mounted axle box cover Brake blocks in wheel plane Individually mounted axle brake rod Continuous and separate steps Individually mounted brake systems Perforated car body supports
On order, shipped within 10-15 days
Prototype Up to the twenties of the previous century, goods trains of all German railway administrations were operated with manual brakes. In addition to the locomotive personnel, the crew of the train therefore included a chief train conductor as the highest authority, a master packer, train conductor and shunter as well as several brakeman. These persons were responsible for braking the train, for the shunting work during stops en route, and the exchange and processing of freight documents of the transported goods. For this purpose, a special accompanying wagon was carried along behind the locomotive that served as a rolling working and recreation place. Only the brakeman had to stay in one of the brakeman's cabins during the trip. Completing the own development, the KPEV (Royal Prussian Railway Administration) procured luggage wagons ("Pwg") according to master drawing pr IIa 13a for the first time in 1913/14. After the end of World War I, this design was selected as replacement of the old or missing accompanying wagons of the most German Länder railway operators. So, over 7,000 "Pwg" were built according to the 2nd revised edition of the master drawing until 1929 and spread not only in the former KPEV region, but also in Baden, Bavaria, Wuerttemberg, and Saxony. Starting at the end of the thirties, the DRB removed the through-going running boards and handlebars, allegedly due to an attempted robbery of a train. Additional structural alterations even before the outbreak of the war included reinforcements of the wagon body frame and the removal of the window in the storage space door. Model True to original construction differences True to era lighting, e.g. gas or electric lighting True to era roof fittings True to original car bottom Metal axle holders Bogie with three-point support Individually mounted axle box cover Brake blocks in wheel plane Individually mounted axle brake rod Continuous and separate steps Individually mounted brake systems Perforated car body supports
On order, shipped within 10-15 days
Prototype Up to the twenties of the previous century, goods trains of all German railway administrations were operated with manual brakes. In addition to the locomotive personnel, the crew of the train therefore included a chief train conductor as the highest authority, a master packer, train conductor and shunter as well as several brakeman. These persons were responsible for braking the train, for the shunting work during stops en route, and the exchange and processing of freight documents of the transported goods. For this purpose, a special accompanying wagon was carried along behind the locomotive that served as a rolling working and recreation place. Only the brakeman had to stay in one of the brakeman's cabins during the trip. Completing the own development, the KPEV (Royal Prussian Railway Administration) procured luggage wagons ("Pwg") according to master drawing pr IIa 13a for the first time in 1913/14. After the end of World War I, this design was selected as replacement of the old or missing accompanying wagons of the most German Länder railway operators. So, over 7,000 "Pwg" were built according to the 2nd revised edition of the master drawing until 1929 and spread not only in the former KPEV region, but also in Baden, Bavaria, Wuerttemberg, and Saxony. Starting at the end of the thirties, the DRB removed the through-going running boards and handlebars, allegedly due to an attempted robbery of a train. Additional structural alterations even before the outbreak of the war included reinforcements of the wagon body frame and the removal of the window in the storage space door. Model True to original construction differences True to era lighting, e.g. gas or electric lighting True to era roof fittings True to original car bottom Metal axle holders Bogie with three-point support Individually mounted axle box cover Brake blocks in wheel plane Individually mounted axle brake rod Continuous and separate steps Individually mounted brake systems Perforated car body supports
On order, shipped within 10-15 days
Prototype Up to the twenties of the previous century, goods trains of all German railway administrations were operated with manual brakes. In addition to the locomotive personnel, the crew of the train therefore included a chief train conductor as the highest authority, a master packer, train conductor and shunter as well as several brakeman. These persons were responsible for braking the train, for the shunting work during stops en route, and the exchange and processing of freight documents of the transported goods. For this purpose, a special accompanying wagon was carried along behind the locomotive that served as a rolling working and recreation place. Only the brakeman had to stay in one of the brakeman's cabins during the trip. Completing the own development, the KPEV (Royal Prussian Railway Administration) procured luggage wagons ("Pwg") according to master drawing pr IIa 13a for the first time in 1913/14. After the end of World War I, this design was selected as replacement of the old or missing accompanying wagons of the most German Länder railway operators. So, over 7,000 "Pwg" were built according to the 2nd revised edition of the master drawing until 1929 and spread not only in the former KPEV region, but also in Baden, Bavaria, Wuerttemberg, and Saxony. Starting at the end of the thirties, the DRB removed the through-going running boards and handlebars, allegedly due to an attempted robbery of a train. Additional structural alterations even before the outbreak of the war included reinforcements of the wagon body frame and the removal of the window in the storage space door. Model True to original construction differences True to era lighting, e.g. gas or electric lighting True to era roof fittings True to original car bottom Metal axle holders Bogie with three-point support Individually mounted axle box cover Brake blocks in wheel plane Individually mounted axle brake rod Continuous and separate steps Individually mounted brake systems Perforated car body supports
On order, shipped within 10-15 days
Prototype In order to achieve a larger loading space of 40 m3, the undercarriage and the wheel base of the previous Otmm wagons were extended by 500 mm. The first of these wagons with a capacity of 40 m3 was built by the Paderborn railway repair shop on a trial basis in 1961. The design stood the test, and so the railway repair shops of Kaiserslautern and Weiden built more than 16,000 Otmm 70/Ed 090 wagons between 1961 and 1970, also using profiles of old but usable Omm 37 wagons. The wagons - referred to as Fc 090 from 1980 onwards - ran as single wagons and in block trains with bulk goods of all kinds. A shortage of hinged roof wagons led to the fact that they were also covered with tarpaulins and used for the transport of cereals. Consequently, 1,500 wagons were equipped with hinged roofs in 1978/79 and referred to as Tdgs-z 932. Many other wagons received a load alteration switchover and were referred to as Fcs 090 or, after being adapted for further operation from 1991 onwards, as Fcs 092. In 1994, the DB AG took over even more than 8,500 Fc(s) 090 wagons which were decommissioned until 2007. In 2012, around 2,600 of the Fcs 092 wagons were still in service, another 786 wagons were used as Fcs-x 092 in coal transport. Model Metal axle holders Bogie with three-point support Individually mounted brake system Brake blocks in wheel plane Many separately mounted parts Individually mounted axle box cover Free standing ladders Individually mounted railing Replica of the supports in the funnel
On order, shipped within 10-15 days
Prototype In order to achieve a larger loading space of 40 m3, the undercarriage and the wheel base of the previous Otmm wagons were extended by 500 mm. The first of these wagons with a capacity of 40 m3 was built by the Paderborn railway repair shop on a trial basis in 1961. The design stood the test, and so the railway repair shops of Kaiserslautern and Weiden built more than 16,000 Otmm 70/Ed 090 wagons between 1961 and 1970, also using profiles of old but usable Omm 37 wagons. The wagons - referred to as Fc 090 from 1980 onwards - ran as single wagons and in block trains with bulk goods of all kinds. A shortage of hinged roof wagons led to the fact that they were also covered with tarpaulins and used for the transport of cereals. Consequently, 1,500 wagons were equipped with hinged roofs in 1978/79 and referred to as Tdgs-z 932. Many other wagons received a load alteration switchover and were referred to as Fcs 090 or, after being adapted for further operation from 1991 onwards, as Fcs 092. In 1994, the DB AG took over even more than 8,500 Fc(s) 090 wagons which were decommissioned until 2007. In 2012, around 2,600 of the Fcs 092 wagons were still in service, another 786 wagons were used as Fcs-x 092 in coal transport. Model Metal axle holders Bogie with three-point support Individually mounted brake system Brake blocks in wheel plane Many separately mounted parts Individually mounted axle box cover Free standing ladders Individually mounted railing Replica of the supports in the funnel
On order, shipped within 10-15 days
Prototype In order to achieve a larger loading space of 40 m3, the undercarriage and the wheel base of the previous Otmm wagons were extended by 500 mm. The first of these wagons with a capacity of 40 m3 was built by the Paderborn railway repair shop on a trial basis in 1961. The design stood the test, and so the railway repair shops of Kaiserslautern and Weiden built more than 16,000 Otmm 70/Ed 090 wagons between 1961 and 1970, also using profiles of old but usable Omm 37 wagons. The wagons - referred to as Fc 090 from 1980 onwards - ran as single wagons and in block trains with bulk goods of all kinds. A shortage of hinged roof wagons led to the fact that they were also covered with tarpaulins and used for the transport of cereals. Consequently, 1,500 wagons were equipped with hinged roofs in 1978/79 and referred to as Tdgs-z 932. Many other wagons received a load alteration switchover and were referred to as Fcs 090 or, after being adapted for further operation from 1991 onwards, as Fcs 092. In 1994, the DB AG took over even more than 8,500 Fc(s) 090 wagons which were decommissioned until 2007. In 2012, around 2,600 of the Fcs 092 wagons were still in service, another 786 wagons were used as Fcs-x 092 in coal transport. Model Metal axle holders Bogie with three-point support Individually mounted brake system Brake blocks in wheel plane Many separately mounted parts Individually mounted axle box cover Free standing ladders Individually mounted railing Replica of the supports in the funnel
On order, shipped within 10-15 days
Prototype In order to achieve a larger loading space of 40 m3, the undercarriage and the wheel base of the previous Otmm wagons were extended by 500 mm. The first of these wagons with a capacity of 40 m3 was built by the Paderborn railway repair shop on a trial basis in 1961. The design stood the test, and so the railway repair shops of Kaiserslautern and Weiden built more than 16,000 Otmm 70/Ed 090 wagons between 1961 and 1970, also using profiles of old but usable Omm 37 wagons. The wagons - referred to as Fc 090 from 1980 onwards - ran as single wagons and in block trains with bulk goods of all kinds. A shortage of hinged roof wagons led to the fact that they were also covered with tarpaulins and used for the transport of cereals. Consequently, 1,500 wagons were equipped with hinged roofs in 1978/79 and referred to as Tdgs-z 932. Many other wagons received a load alteration switchover and were referred to as Fcs 090 or, after being adapted for further operation from 1991 onwards, as Fcs 092. In 1994, the DB AG took over even more than 8,500 Fc(s) 090 wagons which were decommissioned until 2007. In 2012, around 2,600 of the Fcs 092 wagons were still in service, another 786 wagons were used as Fcs-x 092 in coal transport. Model Metal axle holders Bogie with three-point support Individually mounted brake system Brake blocks in wheel plane Many separately mounted parts Individually mounted axle box cover Free standing ladders Individually mounted railing Replica of the supports in the funnel
On order, shipped within 10-15 days
Prototype In order to achieve a larger loading space of 40 m3, the undercarriage and the wheel base of the previous Otmm wagons were extended by 500 mm. The first of these wagons with a capacity of 40 m3 was built by the Paderborn railway repair shop on a trial basis in 1961. The design stood the test, and so the railway repair shops of Kaiserslautern and Weiden built more than 16,000 Otmm 70/Ed 090 wagons between 1961 and 1970, also using profiles of old but usable Omm 37 wagons. The wagons - referred to as Fc 090 from 1980 onwards - ran as single wagons and in block trains with bulk goods of all kinds. A shortage of hinged roof wagons led to the fact that they were also covered with tarpaulins and used for the transport of cereals. Consequently, 1,500 wagons were equipped with hinged roofs in 1978/79 and referred to as Tdgs-z 932. Many other wagons received a load alteration switchover and were referred to as Fcs 090 or, after being adapted for further operation from 1991 onwards, as Fcs 092. In 1994, the DB AG took over even more than 8,500 Fc(s) 090 wagons which were decommissioned until 2007. In 2012, around 2,600 of the Fcs 092 wagons were still in service, another 786 wagons were used as Fcs-x 092 in coal transport. Model Metal axle holders Bogie with three-point support Individually mounted brake system Brake blocks in wheel plane Many separately mounted parts Individually mounted axle box cover Free standing ladders Individually mounted railing Replica of the supports in the funnel
On order, shipped within 10-15 days
Prototype In order to achieve a larger loading space of 40 m3, the undercarriage and the wheel base of the previous Otmm wagons were extended by 500 mm. The first of these wagons with a capacity of 40 m3 was built by the Paderborn railway repair shop on a trial basis in 1961. The design stood the test, and so the railway repair shops of Kaiserslautern and Weiden built more than 16,000 Otmm 70/Ed 090 wagons between 1961 and 1970, also using profiles of old but usable Omm 37 wagons. The wagons - referred to as Fc 090 from 1980 onwards - ran as single wagons and in block trains with bulk goods of all kinds. A shortage of hinged roof wagons led to the fact that they were also covered with tarpaulins and used for the transport of cereals. Consequently, 1,500 wagons were equipped with hinged roofs in 1978/79 and referred to as Tdgs-z 932. Many other wagons received a load alteration switchover and were referred to as Fcs 090 or, after being adapted for further operation from 1991 onwards, as Fcs 092. In 1994, the DB AG took over even more than 8,500 Fc(s) 090 wagons which were decommissioned until 2007. In 2012, around 2,600 of the Fcs 092 wagons were still in service, another 786 wagons were used as Fcs-x 092 in coal transport. Model Metal axle holders Bogie with three-point support Individually mounted brake system Brake blocks in wheel plane Many separately mounted parts Individually mounted axle box cover Free standing ladders Individually mounted railing Replica of the supports in the funnel
On order, shipped within 10-15 days
Prototype In 1939/40, the Köln-Deutz (Cologne-Deutz) and Uerdingen wagon factories each constructed a quadruple axle tank wagons in a lightweight design. Directly related to this, Westwaggon also manufactured the prototype of the tub-style tender, with which the war locomotives belonging to the BR 42 and 52 were coupled. The development was primarily driven by the military since it was necessary to transport enormous amounts of crude oil and fuels for replenishment purposes. As was the case with all war designs, the lightweight design was fully utilised in order to maximise the potential of the available steel quota. However, it soon became apparent that this was done to the detriment of the durability. At this point, both manufacturers were developing wagons with self-supporting tanks. Whilst Deutz left it at puffer beams, the Uerdinger design also boasted solebars manufactured from bevelled profiles that were intended to contribute in absorbing longitudinal compression forces. The main data of both versions was identical: The length over buffers amounted to 12.40 m, the bogie pivot distance amounted to 6.60 m and the tank contained 63 m3. As a result of the compact design, this amount lead to axle and metre load problems, meaning that it was not possible to completely fill the tank on all routes. Pressed sheet metal bogies with a 2.00 m wheel base were used as the running gear. The wagons that were built up until 1945 were deployed at "Wifo" (scientific research community) and oil associations in order to supply the German Armed Forces. After 1945, various European companies reproduced the wagons in a more advanced form, as did Tatra in Prague in 1946. In 1955, SEAG supplied almost 500 units of the wagons developed from the Uerdingen design to the United States Transportation Corps (USTC). Due to the war, many wagons were lost or remained in the territories of other European state railways . The wagons located in the catchment area of the western occupation zones made their way to VTG, which emerged from the former "Wifo" in 1951. In addition to this, mineral oil companies deployed further wagons in the form of P wagons and emerged as main tenants of the VTG wagons. The wagons that stayed with DR remained in the inventory of the state railway and were only leased out on a long-term basis, primarily to PCK Schwedt/ Oder in this case. The last wagons were only removed from the inventory in the 1990s and were being used as maintenance cars or station wagons. In this guise, they could still be regularly seen after the turn of the millennium. Model Bogie with three-point support Individually mounted wheelchocks Individually mounted brake systems Metal wheels Finely engraved bogies brake shoes in wheel plane Individually mounted axle brake rod
On order, shipped within 10-15 days
Prototype In 1939/40, the Köln-Deutz (Cologne-Deutz) and Uerdingen wagon factories each constructed a quadruple axle tank wagons in a lightweight design. Directly related to this, Westwaggon also manufactured the prototype of the tub-style tender, with which the war locomotives belonging to the BR 42 and 52 were coupled. The development was primarily driven by the military since it was necessary to transport enormous amounts of crude oil and fuels for replenishment purposes. As was the case with all war designs, the lightweight design was fully utilised in order to maximise the potential of the available steel quota. However, it soon became apparent that this was done to the detriment of the durability. At this point, both manufacturers were developing wagons with self-supporting tanks. Whilst Deutz left it at puffer beams, the Uerdinger design also boasted solebars manufactured from bevelled profiles that were intended to contribute in absorbing longitudinal compression forces. The main data of both versions was identical: The length over buffers amounted to 12.40 m, the bogie pivot distance amounted to 6.60 m and the tank contained 63 m3. As a result of the compact design, this amount lead to axle and metre load problems, meaning that it was not possible to completely fill the tank on all routes. Pressed sheet metal bogies with a 2.00 m wheel base were used as the running gear. The wagons that were built up until 1945 were deployed at "Wifo" (scientific research community) and oil associations in order to supply the German Armed Forces. After 1945, various European companies reproduced the wagons in a more advanced form, as did Tatra in Prague in 1946. In 1955, SEAG supplied almost 500 units of the wagons developed from the Uerdingen design to the United States Transportation Corps (USTC). Due to the war, many wagons were lost or remained in the territories of other European state railways . The wagons located in the catchment area of the western occupation zones made their way to VTG, which emerged from the former "Wifo" in 1951. In addition to this, mineral oil companies deployed further wagons in the form of P wagons and emerged as main tenants of the VTG wagons. The wagons that stayed with DR remained in the inventory of the state railway and were only leased out on a long-term basis, primarily to PCK Schwedt/ Oder in this case. The last wagons were only removed from the inventory in the 1990s and were being used as maintenance cars or station wagons. In this guise, they could still be regularly seen after the turn of the millennium. Model Bogie with three-point support Individually mounted wheelchocks Individually mounted brake systems Metal wheels Finely engraved bogies brake shoes in wheel plane Individually mounted axle brake rod
On order, shipped within 10-15 days
Prototype In 1939/40, the Köln-Deutz (Cologne-Deutz) and Uerdingen wagon factories each constructed a quadruple axle tank wagons in a lightweight design. Directly related to this, Westwaggon also manufactured the prototype of the tub-style tender, with which the war locomotives belonging to the BR 42 and 52 were coupled. The development was primarily driven by the military since it was necessary to transport enormous amounts of crude oil and fuels for replenishment purposes. As was the case with all war designs, the lightweight design was fully utilised in order to maximise the potential of the available steel quota. However, it soon became apparent that this was done to the detriment of the durability. At this point, both manufacturers were developing wagons with self-supporting tanks. Whilst Deutz left it at puffer beams, the Uerdinger design also boasted solebars manufactured from bevelled profiles that were intended to contribute in absorbing longitudinal compression forces. The main data of both versions was identical: The length over buffers amounted to 12.40 m, the bogie pivot distance amounted to 6.60 m and the tank contained 63 m3. As a result of the compact design, this amount lead to axle and metre load problems, meaning that it was not possible to completely fill the tank on all routes. Pressed sheet metal bogies with a 2.00 m wheel base were used as the running gear. The wagons that were built up until 1945 were deployed at "Wifo" (scientific research community) and oil associations in order to supply the German Armed Forces. After 1945, various European companies reproduced the wagons in a more advanced form, as did Tatra in Prague in 1946. In 1955, SEAG supplied almost 500 units of the wagons developed from the Uerdingen design to the United States Transportation Corps (USTC). Due to the war, many wagons were lost or remained in the territories of other European state railways . The wagons located in the catchment area of the western occupation zones made their way to VTG, which emerged from the former "Wifo" in 1951. In addition to this, mineral oil companies deployed further wagons in the form of P wagons and emerged as main tenants of the VTG wagons. The wagons that stayed with DR remained in the inventory of the state railway and were only leased out on a long-term basis, primarily to PCK Schwedt/ Oder in this case. The last wagons were only removed from the inventory in the 1990s and were being used as maintenance cars or station wagons. In this guise, they could still be regularly seen after the turn of the millennium. Model Bogie with three-point support Individually mounted wheelchocks Individually mounted brake systems Metal wheels Finely engraved bogies brake shoes in wheel plane Individually mounted axle brake rod
On order, shipped within 10-15 days
Prototype In 1939/40, the Köln-Deutz (Cologne-Deutz) and Uerdingen wagon factories each constructed a quadruple axle tank wagons in a lightweight design. Directly related to this, Westwaggon also manufactured the prototype of the tub-style tender, with which the war locomotives belonging to the BR 42 and 52 were coupled. The development was primarily driven by the military since it was necessary to transport enormous amounts of crude oil and fuels for replenishment purposes. As was the case with all war designs, the lightweight design was fully utilised in order to maximise the potential of the available steel quota. However, it soon became apparent that this was done to the detriment of the durability. At this point, both manufacturers were developing wagons with self-supporting tanks. Whilst Deutz left it at puffer beams, the Uerdinger design also boasted solebars manufactured from bevelled profiles that were intended to contribute in absorbing longitudinal compression forces. The main data of both versions was identical: The length over buffers amounted to 12.40 m, the bogie pivot distance amounted to 6.60 m and the tank contained 63 m3. As a result of the compact design, this amount lead to axle and metre load problems, meaning that it was not possible to completely fill the tank on all routes. Pressed sheet metal bogies with a 2.00 m wheel base were used as the running gear. The wagons that were built up until 1945 were deployed at "Wifo" (scientific research community) and oil associations in order to supply the German Armed Forces. After 1945, various European companies reproduced the wagons in a more advanced form, as did Tatra in Prague in 1946. In 1955, SEAG supplied almost 500 units of the wagons developed from the Uerdingen design to the United States Transportation Corps (USTC). Due to the war, many wagons were lost or remained in the territories of other European state railways . The wagons located in the catchment area of the western occupation zones made their way to VTG, which emerged from the former "Wifo" in 1951. In addition to this, mineral oil companies deployed further wagons in the form of P wagons and emerged as main tenants of the VTG wagons. The wagons that stayed with DR remained in the inventory of the state railway and were only leased out on a long-term basis, primarily to PCK Schwedt/ Oder in this case. The last wagons were only removed from the inventory in the 1990s and were being used as maintenance cars or station wagons. In this guise, they could still be regularly seen after the turn of the millennium. Model Bogie with three-point support Individually mounted wheelchocks Individually mounted brake systems Metal wheels Finely engraved bogies brake shoes in wheel plane Individually mounted axle brake rod
On order, shipped within 10-15 days
Prototype In 1939/40, the Köln-Deutz (Cologne-Deutz) and Uerdingen wagon factories each constructed a quadruple axle tank wagons in a lightweight design. Directly related to this, Westwaggon also manufactured the prototype of the tub-style tender, with which the war locomotives belonging to the BR 42 and 52 were coupled. The development was primarily driven by the military since it was necessary to transport enormous amounts of crude oil and fuels for replenishment purposes. As was the case with all war designs, the lightweight design was fully utilised in order to maximise the potential of the available steel quota. However, it soon became apparent that this was done to the detriment of the durability. At this point, both manufacturers were developing wagons with self-supporting tanks. Whilst Deutz left it at puffer beams, the Uerdinger design also boasted solebars manufactured from bevelled profiles that were intended to contribute in absorbing longitudinal compression forces. The main data of both versions was identical: The length over buffers amounted to 12.40 m, the bogie pivot distance amounted to 6.60 m and the tank contained 63 m3. As a result of the compact design, this amount lead to axle and metre load problems, meaning that it was not possible to completely fill the tank on all routes. Pressed sheet metal bogies with a 2.00 m wheel base were used as the running gear. The wagons that were built up until 1945 were deployed at "Wifo" (scientific research community) and oil associations in order to supply the German Armed Forces. After 1945, various European companies reproduced the wagons in a more advanced form, as did Tatra in Prague in 1946. In 1955, SEAG supplied almost 500 units of the wagons developed from the Uerdingen design to the United States Transportation Corps (USTC). Due to the war, many wagons were lost or remained in the territories of other European state railways . The wagons located in the catchment area of the western occupation zones made their way to VTG, which emerged from the former "Wifo" in 1951. In addition to this, mineral oil companies deployed further wagons in the form of P wagons and emerged as main tenants of the VTG wagons. The wagons that stayed with DR remained in the inventory of the state railway and were only leased out on a long-term basis, primarily to PCK Schwedt/ Oder in this case. The last wagons were only removed from the inventory in the 1990s and were being used as maintenance cars or station wagons. In this guise, they could still be regularly seen after the turn of the millennium. Model Bogie with three-point support Individually mounted wheelchocks Individually mounted brake systems Metal wheels Finely engraved bogies brake shoes in wheel plane Individually mounted axle brake rod
On order, shipped within 10-15 days
Prototype In 1939/40, the Köln-Deutz (Cologne-Deutz) and Uerdingen wagon factories each constructed a quadruple axle tank wagons in a lightweight design. Directly related to this, Westwaggon also manufactured the prototype of the tub-style tender, with which the war locomotives belonging to the BR 42 and 52 were coupled. The development was primarily driven by the military since it was necessary to transport enormous amounts of crude oil and fuels for replenishment purposes. As was the case with all war designs, the lightweight design was fully utilised in order to maximise the potential of the available steel quota. However, it soon became apparent that this was done to the detriment of the durability. At this point, both manufacturers were developing wagons with self-supporting tanks. Whilst Deutz left it at puffer beams, the Uerdinger design also boasted solebars manufactured from bevelled profiles that were intended to contribute in absorbing longitudinal compression forces. The main data of both versions was identical: The length over buffers amounted to 12.40 m, the bogie pivot distance amounted to 6.60 m and the tank contained 63 m3. As a result of the compact design, this amount lead to axle and metre load problems, meaning that it was not possible to completely fill the tank on all routes. Pressed sheet metal bogies with a 2.00 m wheel base were used as the running gear. The wagons that were built up until 1945 were deployed at "Wifo" (scientific research community) and oil associations in order to supply the German Armed Forces. After 1945, various European companies reproduced the wagons in a more advanced form, as did Tatra in Prague in 1946. In 1955, SEAG supplied almost 500 units of the wagons developed from the Uerdingen design to the United States Transportation Corps (USTC). Due to the war, many wagons were lost or remained in the territories of other European state railways . The wagons located in the catchment area of the western occupation zones made their way to VTG, which emerged from the former "Wifo" in 1951. In addition to this, mineral oil companies deployed further wagons in the form of P wagons and emerged as main tenants of the VTG wagons. The wagons that stayed with DR remained in the inventory of the state railway and were only leased out on a long-term basis, primarily to PCK Schwedt/ Oder in this case. The last wagons were only removed from the inventory in the 1990s and were being used as maintenance cars or station wagons. In this guise, they could still be regularly seen after the turn of the millennium. Model Bogie with three-point support Individually mounted wheelchocks Individually mounted brake systems Metal wheels Finely engraved bogies brake shoes in wheel plane Individually mounted axle brake rod
On order, shipped within 10-15 days
Prototype In 1939/40, the Köln-Deutz (Cologne-Deutz) and Uerdingen wagon factories each constructed a quadruple axle tank wagons in a lightweight design. Directly related to this, Westwaggon also manufactured the prototype of the tub-style tender, with which the war locomotives belonging to the BR 42 and 52 were coupled. The development was primarily driven by the military since it was necessary to transport enormous amounts of crude oil and fuels for replenishment purposes. As was the case with all war designs, the lightweight design was fully utilised in order to maximise the potential of the available steel quota. However, it soon became apparent that this was done to the detriment of the durability. At this point, both manufacturers were developing wagons with self-supporting tanks. Whilst Deutz left it at puffer beams, the Uerdinger design also boasted solebars manufactured from bevelled profiles that were intended to contribute in absorbing longitudinal compression forces. The main data of both versions was identical: The length over buffers amounted to 12.40 m, the bogie pivot distance amounted to 6.60 m and the tank contained 63 m3. As a result of the compact design, this amount lead to axle and metre load problems, meaning that it was not possible to completely fill the tank on all routes. Pressed sheet metal bogies with a 2.00 m wheel base were used as the running gear. The wagons that were built up until 1945 were deployed at "Wifo" (scientific research community) and oil associations in order to supply the German Armed Forces. After 1945, various European companies reproduced the wagons in a more advanced form, as did Tatra in Prague in 1946. In 1955, SEAG supplied almost 500 units of the wagons developed from the Uerdingen design to the United States Transportation Corps (USTC). Due to the war, many wagons were lost or remained in the territories of other European state railways . The wagons located in the catchment area of the western occupation zones made their way to VTG, which emerged from the former "Wifo" in 1951. In addition to this, mineral oil companies deployed further wagons in the form of P wagons and emerged as main tenants of the VTG wagons. The wagons that stayed with DR remained in the inventory of the state railway and were only leased out on a long-term basis, primarily to PCK Schwedt/ Oder in this case. The last wagons were only removed from the inventory in the 1990s and were being used as maintenance cars or station wagons. In this guise, they could still be regularly seen after the turn of the millennium. Model Bogie with three-point support Individually mounted wheelchocks Individually mounted brake systems Metal wheels Finely engraved bogies brake shoes in wheel plane Individually mounted axle brake rod
On order, shipped within 10-15 days
Prototype In 1939/40, the Köln-Deutz (Cologne-Deutz) and Uerdingen wagon factories each constructed a quadruple axle tank wagons in a lightweight design. Directly related to this, Westwaggon also manufactured the prototype of the tub-style tender, with which the war locomotives belonging to the BR 42 and 52 were coupled. The development was primarily driven by the military since it was necessary to transport enormous amounts of crude oil and fuels for replenishment purposes. As was the case with all war designs, the lightweight design was fully utilised in order to maximise the potential of the available steel quota. However, it soon became apparent that this was done to the detriment of the durability. At this point, both manufacturers were developing wagons with self-supporting tanks. Whilst Deutz left it at puffer beams, the Uerdinger design also boasted solebars manufactured from bevelled profiles that were intended to contribute in absorbing longitudinal compression forces. The main data of both versions was identical: The length over buffers amounted to 12.40 m, the bogie pivot distance amounted to 6.60 m and the tank contained 63 m3. As a result of the compact design, this amount lead to axle and metre load problems, meaning that it was not possible to completely fill the tank on all routes. Pressed sheet metal bogies with a 2.00 m wheel base were used as the running gear. The wagons that were built up until 1945 were deployed at "Wifo" (scientific research community) and oil associations in order to supply the German Armed Forces. After 1945, various European companies reproduced the wagons in a more advanced form, as did Tatra in Prague in 1946. In 1955, SEAG supplied almost 500 units of the wagons developed from the Uerdingen design to the United States Transportation Corps (USTC). Due to the war, many wagons were lost or remained in the territories of other European state railways . The wagons located in the catchment area of the western occupation zones made their way to VTG, which emerged from the former "Wifo" in 1951. In addition to this, mineral oil companies deployed further wagons in the form of P wagons and emerged as main tenants of the VTG wagons. The wagons that stayed with DR remained in the inventory of the state railway and were only leased out on a long-term basis, primarily to PCK Schwedt/ Oder in this case. The last wagons were only removed from the inventory in the 1990s and were being used as maintenance cars or station wagons. In this guise, they could still be regularly seen after the turn of the millennium. Model Bogie with three-point support Individually mounted wheelchocks Individually mounted brake systems Metal wheels Finely engraved bogies brake shoes in wheel plane Individually mounted axle brake rod
On order, shipped within 10-15 days
Prototype In 1939/40, the Köln-Deutz (Cologne-Deutz) and Uerdingen wagon factories each constructed a quadruple axle tank wagons in a lightweight design. Directly related to this, Westwaggon also manufactured the prototype of the tub-style tender, with which the war locomotives belonging to the BR 42 and 52 were coupled. The development was primarily driven by the military since it was necessary to transport enormous amounts of crude oil and fuels for replenishment purposes. As was the case with all war designs, the lightweight design was fully utilised in order to maximise the potential of the available steel quota. However, it soon became apparent that this was done to the detriment of the durability. At this point, both manufacturers were developing wagons with self-supporting tanks. Whilst Deutz left it at puffer beams, the Uerdinger design also boasted solebars manufactured from bevelled profiles that were intended to contribute in absorbing longitudinal compression forces. The main data of both versions was identical: The length over buffers amounted to 12.40 m, the bogie pivot distance amounted to 6.60 m and the tank contained 63 m3. As a result of the compact design, this amount lead to axle and metre load problems, meaning that it was not possible to completely fill the tank on all routes. Pressed sheet metal bogies with a 2.00 m wheel base were used as the running gear. The wagons that were built up until 1945 were deployed at "Wifo" (scientific research community) and oil associations in order to supply the German Armed Forces. After 1945, various European companies reproduced the wagons in a more advanced form, as did Tatra in Prague in 1946. In 1955, SEAG supplied almost 500 units of the wagons developed from the Uerdingen design to the United States Transportation Corps (USTC). Due to the war, many wagons were lost or remained in the territories of other European state railways . The wagons located in the catchment area of the western occupation zones made their way to VTG, which emerged from the former "Wifo" in 1951. In addition to this, mineral oil companies deployed further wagons in the form of P wagons and emerged as main tenants of the VTG wagons. The wagons that stayed with DR remained in the inventory of the state railway and were only leased out on a long-term basis, primarily to PCK Schwedt/ Oder in this case. The last wagons were only removed from the inventory in the 1990s and were being used as maintenance cars or station wagons. In this guise, they could still be regularly seen after the turn of the millennium. Model Bogie with three-point support Individually mounted wheelchocks Individually mounted brake systems Metal wheels Finely engraved bogies brake shoes in wheel plane Individually mounted axle brake rod
On order, shipped within 10-15 days
Prototype In 1939/40, the Köln-Deutz (Cologne-Deutz) and Uerdingen wagon factories each constructed a quadruple axle tank wagons in a lightweight design. Directly related to this, Westwaggon also manufactured the prototype of the tub-style tender, with which the war locomotives belonging to the BR 42 and 52 were coupled. The development was primarily driven by the military since it was necessary to transport enormous amounts of crude oil and fuels for replenishment purposes. As was the case with all war designs, the lightweight design was fully utilised in order to maximise the potential of the available steel quota. However, it soon became apparent that this was done to the detriment of the durability. At this point, both manufacturers were developing wagons with self-supporting tanks. Whilst Deutz left it at puffer beams, the Uerdinger design also boasted solebars manufactured from bevelled profiles that were intended to contribute in absorbing longitudinal compression forces. The main data of both versions was identical: The length over buffers amounted to 12.40 m, the bogie pivot distance amounted to 6.60 m and the tank contained 63 m3. As a result of the compact design, this amount lead to axle and metre load problems, meaning that it was not possible to completely fill the tank on all routes. Pressed sheet metal bogies with a 2.00 m wheel base were used as the running gear. The wagons that were built up until 1945 were deployed at "Wifo" (scientific research community) and oil associations in order to supply the German Armed Forces. After 1945, various European companies reproduced the wagons in a more advanced form, as did Tatra in Prague in 1946. In 1955, SEAG supplied almost 500 units of the wagons developed from the Uerdingen design to the United States Transportation Corps (USTC). Due to the war, many wagons were lost or remained in the territories of other European state railways . The wagons located in the catchment area of the western occupation zones made their way to VTG, which emerged from the former "Wifo" in 1951. In addition to this, mineral oil companies deployed further wagons in the form of P wagons and emerged as main tenants of the VTG wagons. The wagons that stayed with DR remained in the inventory of the state railway and were only leased out on a long-term basis, primarily to PCK Schwedt/ Oder in this case. The last wagons were only removed from the inventory in the 1990s and were being used as maintenance cars or station wagons. In this guise, they could still be regularly seen after the turn of the millennium. Model Bogie with three-point support Individually mounted wheelchocks Individually mounted brake systems Metal wheels Finely engraved bogies brake shoes in wheel plane Individually mounted axle brake rod
On order, shipped within 10-15 days

